Agenda and minutes

Venue: Council Chamber - Guildhall, Bath. View directions

Contact: Jack Latkovic  01225 394452

Media

Items
No. Item

72.

Welcome and introductions

Additional documents:

Minutes:

The Chair welcomed everyone to the meeting.

73.

Emergency Evacuation Procedure

The Chair will draw attention to the emergency evacuation procedure as set out in the Notes

Additional documents:

Minutes:

The Senior Democratic Services Officer drew attention to the evacuation procedure as set out in the Agenda.

74.

Apologies for Absence

Additional documents:

Minutes:

There were no apologies for absence.

75.

Declarations of Interest

At this point in the meeting declarations of interest are received from Members in any of the agenda items under consideration at the meeting. Members are asked to indicate:

(a) The agenda item number in which they have an interest to declare.

(b) The nature of their interest.

(c) Whether their interest is a disclosable pecuniary interest or an other interest,  (as defined in Part 2, A and B of the Code of Conduct and Rules for Registration of Interests)

Any Member who needs to clarify any matters relating to the declaration of interests is recommended to seek advice from the Council’s Monitoring Officeror a member of his staff before the meeting to expedite dealing with the item during the meeting.

Additional documents:

Minutes:

There were none.

76.

To Announce any Urgent Business Agreed by the Chair

Additional documents:

Minutes:

There was none.

77.

Questions from Public and Councillors

Questions submitted before the deadline will receive a reply from an appropriate Cabinet member or a promise to respond within 5 days of the meeting.  Councillors may ask one supplementary question for each question they submitted, up to a maximum of two per Councillor.

Additional documents:

Minutes:

There were 18 questions from Councillors and 2 questions from members of the public.

[Copies of the questions and responses, including supplementary questions and responses if any, have been placed on the Minute book as Appendix 1 and are available on the Council's website.]

Appendix 1 pdf icon PDF 172 KB

Additional documents:

78.

Statements, Deputations or Petitions from Public or Councillors

Councillors and members of the public may register their intention to make a statement if they notify the subject matter of their statement before the deadline.  Statements are limited to 3 minutes each.  The speaker may then be asked by Cabinet members to answer factual questions arising out of their statement.

Additional documents:

Minutes:

David Redgewell addressed the Cabinet by expressing his concern that Keynsham train station was not part of the MetroWest project.  The project should take into account an additional housing built in Keynsham and rise in demand for train services.  David Redgewell welcomed allocation of £70k for better bus in the area and highlighted that it should be important to maintain evening and weekend buses.

 

Councillor Alison Millar addressed the Cabinet by saying that there had been a strong and focused opposition to the Park and Ride site on Bathampton Meadows.  The petition against the Park and Ride now has over 10,000 signatures and MP Jacob Rees-Mogg had raised this issue in the Parliament.  £9.7m had been allocated from the budget for this issue, which Councillor Millar had called it as risky decision with no mandate.  Councillor Millar concluded her statement by saying that there was no hard evidence on the demand and take up of the Park and Ride on Bathampton Meadows and that this would not be good legacy for the current administration.

 

79.

Minutes of Previous Cabinet Meeting pdf icon PDF 102 KB

To be confirmed as a correct record and signed by the Chair

Additional documents:

Minutes:

RESOLVED that the minutes of the meeting held on Wednesday 2nd December 2015 be confirmed as a correct record and signed by the Chair.

80.

Consideration of Single Member Items Requisitioned to Cabinet

This is a standard agenda item, to cover any reports originally placed on the Weekly list for single Member decision making, which have subsequently been the subject of a Cabinet Member requisition to the full Cabinet, under the Council’s procedural rules

Additional documents:

Minutes:

There were none.

81.

Matters Referred by Policy Development and Scrutiny Bodies

This is a standing agenda item (Constitution rule 14, part 4D – Executive Procedure Rules) for matters referred by Policy Development and Scrutiny bodies.  The Chair of the relevant PDS Panel will have the right to attend and to introduce the Panel’s recommendations to Cabinet.

 

Councillor Sarah Bevan will address the Cabinet as the Chair of the Resources Policy Development and Scrutiny Panel.

Additional documents:

Minutes:

The Chair invited Councillor Sarah Bevan, as Resources PDS Chair, to address the Cabinet.

 

The Chair informed the meeting that the Cabinet had received a copy of draft minutes of the last Resources PDS meeting.

 

Councillor Sarah Bevan read out a statement to the Cabinet (available on the Minute Book in Democratic Services) giving the following concerns from the Resources PDS Panel:

·  The Panel expressed major concerns that the Government settlement might not be finalised in time for the budget to be set next Tuesday;

·  The Panel voiced its awareness of heavy reliance on generating extra income – more than £7m over 4 years;

·  The Panel was concerned that there was a lack of detail about that element of the proposal and lack of detail about modifications made since the draft settlement and the November Panel meetings;

·  The Panel was concerned about the social care savings calculation, given the increase in demand for these services, despite the 2% precept proposed;

·  The proposed budget involves high risk to the Council;

·  The proposed budget may not be balanced;

·  The use of reserves to fund ‘invest to save’ schemes is a risk; and

·  The proposed £2m savings from staff may have an adverse effect on residents’ front line services, not to mention the staff themselves in some cases.

In summary, the Panel would prefer less dependence on risky new initiatives and more detailed information overall.

 

The Chair thanked Councillor Bevan on her statement.

82.

Single Member Cabinet Decisions Taken since Previous Cabinet Meeting pdf icon PDF 130 KB

This report lists Cabinet Single Member decisions taken and published since the last Cabinet meeting.

Additional documents:

Minutes:

The Cabinet agreed to note the report.

83.

Urban Gulls Strategy and Action Plan pdf icon PDF 139 KB

The adoption of a revised and updated urban gull strategy and action plan for 2016-2019 to fulfill three core objectives of deterring the gull population; removing access to food sources and increased communication with the public to further gain their support in tackling the problem.

Additional documents:

Minutes:

Councillor Dine Romero gave a statement by saying that, on a face of it, the Gulls Strategy could be a good thing but that she had had a concern that the Council would spend £60k on measures which had not worked in the past.  Councillor Romero also said that some of the proposed measures would have limited effect, as highlighted in the Scrutiny report not so long ago.  Councillor Romero concluded her statement by saying that she would be looking forward to hear what research would be done on this matter and how the Council would lobby the Government on this issue.

 

Councillor Martin Veal said that this was an updated and revised strategy, which was needed for the city.  Councillor Veal commended previous work undertaken by officers and scrutiny in this area.  If approved, the strategy would start immediately.  The strategy would finalise innovative and mutually beneficial research project by gathering the evidence in a way that was not possible before.  Councillor Veal also said that he would, via local MPs, lobby central government to get this issue properly raised and addressed.  The strategy fulfils manifesto pledge to tackle issue of gulls in the city and £86k would be allocated to tackle a serious of measures.

 

Councillor Martin Veal moved the recommendations.

 

Councillor Tim Warren seconded the motion by saying that it is important for this issue to be tackled.  £85k had been earmarked for this three-pronged approach which would trial a series of measures to deter the gull population from settling in the area.  This innovative approach would provide an opportunity to gather evidence at a scale that hasn’t been possible before, providing a clear steer on future intervention work and targeting of resources.

 

RESOLVED (unanimously) that the Cabinet:

 

1)  Adopt the revised urban gull strategy.

2)  Officers progress, in consultation with the Cabinet Member, the following measures prioritised for delivery in 2015/16 and 2016/17 using the allocated funding of £85k. These are:

a)  Provision of a pilot gull treatment programme supported by a communications campaign for areas in Abbey, Kingsmead, Widcombe, Newbridge, Westmoreland, Twerton and Midsomer Norton. This will be delivered through an external contractor chosen through an open and transparent tender process.

b)  An additional officer for waste education and enforcement for 6 months.

c)  The delivery of a comprehensive communications campaign.

3)  The Cabinet Member, in consultation with officers, will apportion the budget of £85k to each of the above recommendations.

4)  In addition the Council will enter into a collaborative partnership with the University of the West of England and Middlesex University to map and track the behavioural patterns of gulls and deliver a citizen science project.

84.

Metro West Phase 1 Update Report pdf icon PDF 99 KB

This is to update the Cabinet on progress with the Metro West Phase 1 Rail Project and especially to update Cabinet on the risks with the project and the potential revenue support that the new services may require when they open in 2019 or 2020. This will need to be factored into the medium term financial plan in due course.

Additional documents:

Minutes:

Councillor Neil Butters welcomed that Metro West project had been progressing and that it should not stop with phases 1 and 2.  Councillor Butters also said that the Council should use this opportunity in extending services to Chippenham where service connections between Swindon and Saltford, including Corsham, could be provided.  Councillor Butters concluded his statement by expressing his concern for cuts in bus subsidies in Wiltshire which could have an impact on B&NES area.

 

Councillor Eleanor Jackson also welcomed the report but felt that it did not go into detail, such as that there was no mention on development of railway between Frome and Radstock.

 

Councillor Anthony Clarke said that he was aware of matters raised by Councillors Butters and Jackson, and that he would make sure that these issues were picked up.  The Metro West Project aims to improve the local rail network which had been under-developed compared with most other major urban areas. The aim was to provide regular half-hourly services across the sub-region. The first stage of this project, Metro West Phase 1, would re-open the Portishead railway and improve frequencies on the Severn beach Line and into Bath and North East Somerset. The project had received significant support from DfT, which had considered the proposal to be well developed.  The project would link the Bristol Enterprise Zone with the Bath Riverside Enterprise Area. Improved rail services at Oldfield Park would support the Bath Enterprise Area and at Keynsham would particularly support the adjacent Somerdale and other development areas. The improved rail frequency had been seen as particularly significant in supporting the Master Plan, as well as being a central component of the Core Strategy, Economic Strategy, and both the Getting Around Bath and Keynsham Transport Strategies. 

 

Councillor Anthony Clarke moved the recommendations.

 

Councillor Michael Evans seconded the motion by thanking officers on the report on progress with the MetroWest Phase 1 Rail Project.  Councillor Evans also said that he would be looking forward to receiving a further and more detailed report later in the year.

 

Councillor Charles Gerrish also welcomed the report and added that Network Rail should consider that more and more people had been using train station in Keynsham, hence the need for a cover over the station.  Councillor Gerrish also highlighted shortage of parking in future at the Keynsham train station.

 

RESOLVED (unanimously) that the Cabinet:

 

1)  Noted the contents of this report and would provide continued support for the Metro West Phase 1 Rail Project and acknowledged its links with the Getting around Bath and Keynsham Transport Strategies.

2)  Noted the possible capital cost over-run and made a commitment to revenue support for the first three years of operation.

3)  Noted the possible revenue reversion risk.

4)  Made a consideration in the medium term financial plan for any of these emerging financial pressures.

5)  Noted the timetabling works required in relation to Metro West phase 1 and its impact on the Saltford Station proposal.

 

 

85.

Heritage Services Business Plan: 2016-2021 update pdf icon PDF 257 KB

This is the first update of the Heritage Services Business Plan 2015-2020 that was approved by Cabinet in February 2015. It covers the five financial years from 2016/17 to 2020/21, and has been prepared following the annual in-depth review of business activity. The revised Plan includes an analysis of the risk involved.

Additional documents:

Minutes:

Councillor Rob Appleyard welcomed the report and said that we shouldn’t underestimate the value which Heritage Services had brought to the area.  Councillor Appleyard also welcomed that the report had recognised a risk that the profit targets for 2016-2021 might not be achieved due to sensitivity of planning assumptions and to national and international economic factors.

 

Councillor Andrew Furse welcomed the investment in visitor experience for Roman Baths though he expressed his concern that experience could be unpleasant due to number of visitors at times.

 

Councillor Patrick Anketell-Jones said that overcrowding of Roman Baths, and visitor experience, would be monitored by the management.  Heritage Services’ approach to business planning and generating income had proven to be very successful.  The business philosophy of ensuring the sustainability of unique heritage assets, the audiences attracted and the income streams brought had stood the test of time and had attracted the interest of other organisations, public and private, elsewhere in the UK and overseas.

 

Councillor Patrick Anketell-Jones moved the recommendations.

 

Councillor Liz Richardson seconded the motion by saying that the Victoria Art Gallery exhibition programme had been now included in the Combined ticket to the Roman Baths and Fashion Museum and that this had been already driving footfall upwards and generating a whole new income stream.

 

RESOLVED (unanimously) that the Cabinet:

 

1)  Approved the Heritage Services Business Plan 2016-2021;

2)  Confirmed that it wishes Heritage Services to continue to work to the business principles agreed by the Council Executive in 2004, as amended;

3)  Approved the capital investment outlined in this report and noted that the Budget report also on the agenda for this meeting recommends:

a) Full approval and inclusion in the Approved capital programme of the following projects:

i) The Archway Centre project at a total cost of £5.317 Million in 2017/18 and 2018/19, including a contribution by the Council of £1 Million, (£750k from corporate borrowing and £250k from service-supported borrowing), as detailed in this report

ii) The Roman Baths Infrastructure projects totalling £100k planned for 2016/17

iii) The Victoria Art Gallery air conditioning project, costing £150k in 2016/17, subject to completion of the Project Implementation process

b)  Inclusion in the provisional capital programme of the block of Roman Baths infrastructure projects totalling £600k from 2017/18 to 2020/21

c)  Inclusion of information around emerging capital programme items, to be brought forward for inclusion in the capital programme in future years, for the investment of £1.15 Million per annum in both 2019/20 and 2020/21 in order to begin a further major refurbishment of the entire Roman Baths site

d)  Re-phasing of £100k currently included in Approved the capital programme to develop the second phase of the Visitor Management System project from 2015/16 to 2017/18.

4)  Noted the investment contained within the Business Plan and approved the procurement of goods and services necessary to carry out this investment, including new contracts for security and further digital interpretation during the period of the Plan.

86.

Revenue & Capital Budget Monitoring, Cash Limits and Virements – April to December 2015 pdf icon PDF 140 KB

This report presents the financial monitoring information for the Authority as a whole for the financial year 2015/16 to the end of December 2015.

Additional documents:

Minutes:

Councillor Andrew Furse congratulated officers on bringing the budget within 0.03% of spent though he expressed his concerns that some areas were showing overspend.

 

Councillor Charles Gerrish said that the Budget Management Scheme had required that the Cabinet consider the revenue and capital monitoring position four times per year. For revenue budgets which were forecast to be overspent, the service Directors were normally expected to seek compensating savings to try and bring budgets back to balance.  The report has highlighted significant areas of forecast over and under spends in revenue budgets and outlined the Council’s current revenue financial position for the 2015/16 financial year to the end of December 2015 by Cabinet Portfolio. The current forecast outturn position was for an underspend of £128,000 which equates to 0.03% of gross budgeted spend (excluding Schools).  In addition, as previously reported, uncommitted New Care Act burdens funding would be transferred to a specific Council Care Act Reserve at year end, currently estimated to be £750,000.

 

Councillor Charles Gerrish moved the recommendations.

 

Councillor Vic Pritchard seconded the motion by saying that the Council’s financial position, along with its financial management arrangements and controls, were fundamental to continuing to plan and provide services in a managed way, particularly in light of the medium term financial challenge.  The revenue budget for 2015/16 had included delivery of £9.7m of savings and in addition to this, a further £1.695m of in-year rebasing had been actioned resulting in there no longer being a requirement to use reserves to balance the 2015/16 budget.

 

RESOLVED (unanimously) that the Cabinet agreed that:

 

1)  Strategic Directors should continue to work towards managing within budget in the current year for their respective service areas, and to manage below budget where possible by not committing unnecessary expenditure, through tight budgetary control.

2)  This year’s revenue budget position as shown in the report is noted.

3)  The capital expenditure position for the Council in the financial year to the end of December and the year-end projections detailed in the report are noted.

4)  The revenue virements listed for approval in the report are agreed.

5)  The changes in the capital programme listed in the report are noted.

87.

Treasury Management Monitoring Report to 31st December 2015 pdf icon PDF 561 KB

In February 2012 the Council adopted the 2011 edition of the CIPFA Treasury Management in the Public Services: Code of Practice, which requires the Council to approve a Treasury Management Strategy before the start of each financial year, review performance during the year, and approve an annual report after the end of each financial year.

This report gives details of performance against the Council’s Treasury Management Strategy and Annual Investment Plan 2015/16 for the first nine months of 2015/16.

Additional documents:

Minutes:

Councillor Andrew Furse expressed his concern in regards of future borrowing.  Councillor Furse said that borrowing would rise from £180m this year to £300m till 2018.  Councillor Furse concluded his statement by saying that this would have revenue implications and questioned if this was the right time to increase capital funding.

 

Councillor Charles Gerrish said that this report had given details of performance against the Council’s Treasury Management Strategy and Annual Investment Plan 2015/16 for the first nine months of 2015/16. The average rate of investment return for the first nine months of 2015/16 was 0.47%, which was 0.08% above the benchmark rate. £10 million of annual borrowing matured during the third quarter of 2015/16. These funds were re-borrowed for a further 12 months at a more beneficial interest rate. The Council’s total borrowing was £108.3 million as at 31st December 2015.

 

Councillor Charles Gerrish moved the recommendations.

 

Councillor Michael Evans seconded the motion by saying that investments returns had continued to be ahead of the benchmark rate whilst reflecting the continued low interest rate environment; that investments had remained diversified across UK banks, building societies and very highly rated foreign banks; and that the Council had continued to not hold any direct investments in countries within the Eurozone.

 

RESOLVED (unanimously) that the Cabinet agreed that:

 

1)  The Treasury Management Report to 31st December 2015, prepared in accordance with the CIPFA Treasury Code of Practice, is noted

2)  The Treasury Management Indicators to 31st December 2015 are noted.

88.

2016/17 Treasury Management & Investment Strategy pdf icon PDF 109 KB

In February 2012, the Council adopted the revised CIPFA Treasury Management in Public services Code of Practice 2011 Edition, which requires the Council to approve a Treasury Management Strategy before the start of each financial year and for this to be scrutinised by an individual / group of individuals or committee.

In addition, the Department for Communities and Local Government (CLG) issued revised guidance on local authority investments in March 2010 that requires the Council to approve an investment strategy before the start of each financial year.

This report fulfils the Council’s legal obligation under the Local Government Act 2003 to have regard to both the CIPFA Code and the CLG Guidance.

This report is due to be scrutinised by the Corporate Audit Committee at the 4th February 2016 meeting, following which any recommendations will be reported back verbally as an update to this report.

Additional documents:

Minutes:

Councillor Charles Gerrish said that this report fulfils the Council’s legal obligation under the Local Government Act 2003 to have regard to both the CIPFA Code and the CLG Guidance. This report had been scrutinised by the Corporate Audit Committee at the 4th February 2016 meeting. Councillor Gerrish assured Councillor Furse that the income generated from the bulk of the borrowing would exceed the cost of borrowing.  This wouldn’t be a ‘leap in the dark’ and it would generate income for the Council.

 

Councillor Patrick Anketell-Jones seconded the motion by saying that this strategy had set out the Council’s policies for managing its investments and for giving priority to the security and liquidity of those investments.  The Council’s borrowing strategy of using internal resources or borrowing short term would be kept under review taking account of future interest rate forecasts.

 

RESOLVED (unanimously) that the Cabinet agreed to:

 

1)  Recommend the actions proposed within the Treasury Management Strategy Statement to February Council for approval.

2)  Recommend the Investment Strategy to February Council for approval.

3)  Recommend to February Council for approval that decisions to borrow from the Local Government Association (LGA) Bond Agency are delegated to the Chief Finance Officer in consultation with the Cabinet Member for Finance & Efficiency.

4)  Note the Treasury Management Indicators and delegate authority for updating the indicators prior to approval at Full Council on 16th February 2016 to the Chief Finance Officer and Cabinet Member for Finance & Efficiency, in light of any changes to the recommended budget as set out in the Budget Report elsewhere on the agenda for this meeting.

89.

Budget and Council Tax 2016/17 and Financial Outlook 2016/17 to 2019/20 pdf icon PDF 166 KB

This report presents the Cabinet's revenue and capital budgets for the 2016/17 financial year together with a proposal for a Council Tax level for 2016/17.

Additional documents:

Minutes:

Councillor Dine Romero said that the Cabinet should be mindful of Council’s ability to generate more income taking into consideration that people have less money.  Councillor Romero expressed her concern in risks, in particular that we, as a Council, would have to pay more at later stages.  Councillor Romero also expressed her concerns in efficiency savings in Connecting Families programme and in remodelling of the Public Mental Health, especially since many young children had suffered from mental health issues.  Councillor Romero also questioned if the £1m spent on Schools Capital Maintenance had come straight from the Department of Education.

 

Councillor Andrew Furse expressed his concern in the risk on delivery by saying that proposed budget had had ambitious saving targets without much detail on what those savings were.  Councillor Furse also said that the Council had received £1.8m of Transitional Funding over two years, which was much less than some other authorities in the country received.  Also, as per Councillor Furse, it would be a big challenge in delivering service with so many redundancies expected to happen in near future.  Councillor Furse concluded his statement by expressing his concern in reduction of recycling centres opening hours and also in Highways Maintenance budget cut.

 

Councillor Robin Moss questioned how much of the Central Government grant the Council get would over four years.  Councillor Moss also questioned issue of planning department fees and concluded that despite of an effort that officers had put in this report, there was no enough detail for him to vote on.

 

Councillor Joe Rayment expressed his concerns in cuts within drug and alcohol services, sexual health and health improvement programme.

 

Councillor Lisa Brett commented that schools would face 4.4% increase in their pay bill, which would be huge blow to their budgets.  Councillor Brett questioned how the Cabinet would respond to cuts in schools; whether it was responsible to protect school improvement services on the expense of other Council services; and, what had been done to include the Education Minister in a review of Council’s statutory obligation to schools.

 

Councillor Eleanor Jackson expressed her concerns in cuts on Public Health and also in wasting resources in projects that had not been done right at first time.

 

Councillor Charles Gerrish said that the Council had received the final figures from the Central Government, and that they were unchanged from what was originally envisaged, though the Council would still have to make some significant savings.  The Transitional Funding allocated to this Council had been on par with other neighbouring authorities and similar Councils, which indicated that a visit from the Leader of the Council and Councillor Gerrish to the relevant Minister in January this year had been successful. 

 

Councillor Charles Gerrish highlighted these Key Priorities within the budget:

·  Tackling waste and increasing efficiency

·  Improving transport

·  Delivering new homes and jobs

·  Investing in young people

·  Supporting cleaner, greener and healthier communities

·  Promoting choice and independence for older people.

 