10/02/2020 - To fully approve capital amounting to £250k from the provisional capital programme item CiL of £250k. ref: 1353 Approved
The original Contract with GLL (Sport
operator) required them to design and deliver a new build Leisure
Centre at Keynsham (originally considered to be on Ashton Way Car
Park). This new facility would not have included a Sports Hall or
Squash Courts. During the latter stages of the procurement process
it became apparent that the Ashton Way site presented numerous
challenges, therefore a mandatory variant was built into the
contract to all GLL to operate the existing leisure facility for 5
years. Consultation in September 2015 indicated a strong preference
for the leisure centre to be developed on the Riverside site.
Progression of wider options for the Riverside site have meant that
the Council is currently leading on the design and construction of
a refurbished facility in consultation with GLL (which aims to
provide Sports Hall and Squash facilities). The current DBOM
contract with GLL is being amended to 1) implement mandatory
variant for GLL to manage existing Keynsham Leisure Centre until
July 2021 (long stop date) 2) For the Council to design and deliver
the refurbished centre 3) for a planned shut down of the existing
centre (which will result in some loss of income) 4) Following
completion of works transfer the operation of the centre to GLL
(via negotiation). The project is already well underway and this
request is to fully approve £250k of CiL funding that has
been provisionally approved to help meet the additional costs of
the enlarged facility that is being built following public and Cllr
consutation.
Decision Maker: Corporate Director (Place)
Decision published: 03/02/2020
Effective from: 10/02/2020
Decision:
To fully approve capital amounting to
£250k from the provisional capital programme item CiL of
£250k.
Lead officer: Marc Higgins
27/01/2020 - Introduction of a Street Works Permit Scheme ref: 1350 Approved
Replacing the current 'noticing' system for the management and coordination of road works with a permit scheme, to provide the Council with greater control and to enable it to be compatible with the government's new electronic system of dealing with applications to work on the highway.
Decision Maker: Cabinet Member for Transport Services
Decision published: 27/01/2020
Effective from: 04/02/2020
Decision:
The Cabinet Member agrees that:
1) A street works permit scheme should be introduced through the creation of a legal Order; and
2) New fees and charges related to the permit scheme should be introduced as shown in Table 1 of the covering report.
Wards affected: (All Wards);
Lead officer: Paul Garrod
16/01/2020 - Claverton Neighbourhood Development Plan ref: 1349 Approved
The Localism Act 2011 has reformed the
planning system to give local people new rights to shape the
development of the communities in which they live.
The Act provides for a new type of community-led initiative known
as a Neighbourhood Development Plan which sets out the policies on
the development and use of land in a parish or ‘Neighbourhood
Area’.
The Council has a duty to assist communities in the preparation of
Neighbourhood Development Plans and orders and to take a Plan
through a process of examination and referendum and to bring the
Neighbourhood Plan into force. This duty includes making the plan
as soon as is reasonably practicable but in any event within 8
weeks after the referendum approving the plan has taken
place.
Decision Maker: Director Development and Public Protection
Decision published: 24/01/2020
Effective from: 16/01/2020
Decision:
Make and bring into force the Claverton
Neighbourhood Development Plan as part of the Development Plan for
the Claverton Neighbourhood Area, in accordance with Section 38A(4)
of the Planning and Compulsory Purchase Act 2004 (as amended by the
Localism Act 2011 and the Housing and Planning Act 2016).
Following the Cabinet decision on the 16/01/2020 (E3188) the plan
will be brought into force.
Lead officer: George Blanchard