1 THE ISSUE
1.1 This report introduces the Four-monthly Environment Peformance Report, which is attached as Appendix 1.
2 RECOMMENDATION
2.1 Consider and note the contents of this report
3 FINANCIAL IMPLICATIONS
3.1 Included in the report.
4 THE REPORT
4.1 As part of the Council's performance management framework the Strategic Director (Economic & Environmental Development) is required to submit an Environment Four-monthly performance to the Directors' Group. This report is also submitted to the relevant Portfolio Executive Members and finally a meeting of the Executive Council.
4.2 The Environment Four monthly Performance Report is attached as Appendix 1.
Contact person |
Clive Thomas, Strategic Director (Economic & Environmental Development) |
Background papers |
none |
Report to Directors Group Appendix 1
Date |
18 Dec 02 |
Reporting Area |
Environment |
Lead Director |
Clive Thomas |
SCOPE OF REPORTING AREA: Planning; Environment & Consumer Services; Economic Development; Waste; Refuse; Cleansing; & Parks
1. PROGRESS/ISSUE REPORTING
Progress Made |
Issues to be addressed |
Status/Who ? |
|
LeadershipUpdates on August 2002 report items |
· Regular liaison meetings with Property Services · Joint working with Private sector on planning issues · Bath Spa 10 yr Development framework · DEFRA funded projects progressing: plastics expansion to be phased in from Dec 02 across district: Bulky waste project has experienced delays in setting up of furniture workshops, contingencies being developed in absence of year 2 funding. Retail outlet at Ham Gardens progressing well Target end January to open. · Best Value Review Action Plan now being progressed · Car clear partnership progressing well. Briefing session held with Executive member and police/firebrigade personnel. Pioneering rethink Rubbish campaign continuing with extensive advertising and programme of events |
· Assist in joining up approaches to issues · Dialogue continuing · Continued dialogue needed to progress. Overview and Scrutiny likely to investigate Student Housing Issue · Yr 2 funding for Bulky waste project not successful. Contingenices now being planned to extend longevity of project as far as possible. · Funding for plastics expansion included as a development bid within the budget process. · Kathy Timmins appointed within TAWM to aid progress with action plan. · Year 2 funding from police & fire authorities in doubt. No external funding secured as yet. · Review of landfill tax credit scheme means that future funding for campaign is uncertain |
David Davies Gary Collins Steering Group Executive Members |
Progress Made |
Issues to be addressed |
Status/Who ? |
|
LeadershipNew items |
· Liaison meetings with TAWM on public realm and major projects · Receipt of Quality Mark for Consumer Advice from Legal Services Commission · Consumer advice community shop at New Bond Street · Environment Park - 24 contractors have responded with expressions of interest from PIN notice. Consultant to be appointed to advise on procurement contract documentation and strategic partner agreement |
· Agreed approach to work on the streets and spaces together and with proper co-ordination on major schemes · None · Look for future opportunities · Future Resourcing |
Vaughan Thompson and E. Flanagan Howard Nowell Richard Robertson |
People ManagementUpdates on August 2002 report items |
· Change in Tourism delivery (arms length company) will have resource implications. · Staff Resources - unsuccessful in appointment of Head of Waste Management & Zero Waste · Transfer of operational staff to Direct Services completed September 2002. |
· Needs careful analysis and explicit budgetary decisions relative to performance of Tourism · Revised structure being implemented, including appointment of a consultant to progress zero waste issues · Revised job descriptions for staff. |
Bill Cotton Clive Thomas |
People ManagementNew items |
· Giles Ingram seconded from Bristol Tourism Company as interim Tourism Manager · Completion of disability equality audit |
· Appointing Staff to vacancies now company structure is clearer · Development of disability equality action plan |
HoS |
Policy and Strategy Updates on August 2002 report items |
· Awareness of new planning regulation following the Green Paper · Zero waste strategy to be developed by a consultant, with high profile in waste sector · Public Service Agreements developed for increased waste recycling & enhanced public convenience provision |
· Local plan needs to be ready to adapt to new requirements · Consultant to advise on environment park development also. Funding available through strategic rail authority grant. · PSA's currently being negotiated with government |
David Davies and V Thompson Richard Robertson Corporate Projects |
Progress Made |
Issues to be addressed |
Status/Who ? |
|
Policy and Strategy New items |
· Draft Sustainable Economic Development Plan out to consultation Dec - Jan 2003 · Employment land study and small sites study to contribute to local plan · Role of Joint Unit being examined in advance of new legislation · Street Trading Policy agreed · Public convenience strategy to be considered in further detail by executive member · Good progress is being made on the World Heritage Site Plan |
· Changes after consultation need to be made and agreed · Ensuring proper integration into Local Plan process · Increased role for transportation issues and interface with regional assembly · Implementation · Revision of current report in line with executive member aspirations · Draft document to be agreed for consultation purposes |
D Davies and V Thompson EML Manager Richard Robertson D Davies |
ResourcesUpdates on August 2002 report items |
· Work load Fund · Tourism Underachievement of income · Planning work load levels still at a very high level · Voluntary sector grant budget agreed · Government Grant of £114K awarded for the treatment of fridges in 2002/03. 4500 fridges currently in storage at Entry Hill can now be recycled this financial year. · Landfill tax funding for year 2 of the Rethink Rubbish Campaign has been confirmed as being secure, despite the review of the operation of the landfill tax credit scheme. · Rail Track Access Grant now secured. |
· Major applications are likely to reduce performance in Planning without additional resource · Recovery plan awaited. · Communication and distribution · This funding will be allocated through the SSA in future - must be earmarked for treatment of fridges to ensure storage facility at Entry Hill is no longer essential. Planning Consent for Entry Hill extended only until July 2003. · The review of the landfill tax credit schemes recommends significant changes to the allocation of funds. It is unclear as yet how funds will be administered in future, but only a third of the monies currently available will be bid for through current system. Optimistic that LA's should have easier access to funds in future. |
David Davies David Davies Done Clive Thomas Clive Thomas |
Progress Made |
Issues to be addressed |
Status/Who ? |
|
ResourcesNew items |
· Long Term sickness issues impacting on performance in some areas · Environmental and Consumer Services forecast year end under spend (180K) |
· Long Term sickness does impact on performance but difficulties in dealing with issues in the context of employment law · Ring fenced for Best Value Improvement Plan Actions |
David Davies Human Resources Howard Nowell |
ProcessUpdates on August 2002 report items |
· Extent of delegations of planning decisions · Gain clear agreement from RDA on where Market & Coastal Towns project is going - clarification sought from RDA (workshop held in December) · Major Planning Application Delivery contract agreed · Licensing Committee member training · Method statements for Cleansing enforcement received. Timetable agreed with Direct Services for additional method statements. |
· Outcome of Overview and Scrutiny awaited · Focus needs to move to action rather than discussion · This is necessary to counter the problems of the BVPI relating to major projects · Training day 13 December · Revision of 3 contract specs into 1 to be completed by April 2003 |
Bill Cotton David Davies HoS Matthew Smith/Clive Thomas |
ProcessNew Items |
· Enforcement Policy out for consultation · Planning Services High satisfaction level by user 81% · Under age alcohol sales test purchasing initiative - 8 of 22 `fail' · Parish Sweeping Scheme - report agreed by executive. Revisions to scheme to be implemented in April 2003 |
· It is vital to achieve prioritisation of enforcement issues · The increase in satisfaction levels by nearly 20% in two years is a reflection of better service delivery. · Consider prosecution · Anticipate £30K savings. Cleansing zone maps need revising in accordance with parish wishes where appropriate. |
David Davies FTS Manager CT/Direct Services |
2. Reporting on targets and commitments made in the Performance Plan
Summary of Performance
Performance Targets |
No. |
% |
RED |
5 |
9% |
AMBER |
13 |
25% |
GREEN |
24 |
45% |
NOT KNOWN |
11 |
21% |
TOTAL |
53 |
100% |
Ref. |
Indicator |
Top 25% |
2000/ 01 Actual |
2001/ 02 Est/ Actual |
2002/3 Target |
2002/ 03 Estd Out-turn |
Status |
Comment |
|||||
ENVIRONMENTAL & CONSUMER SERVICES |
|||||||||||||
179 |
Percentage of standard searches carried out in 10 working days |
100% |
100% |
100% |
100% |
100% |
Green |
||||||
166 |
Score against a checklist of enforcement best practice for environmental health/trading standards |
8 |
8 |
8 |
Green |
||||||||
Local37 |
Percentage of environmental health, trading standards and licensing customers rating service as good, very good or excellent |
91% |
89% |
92% |
91% |
Amber |
|||||||
Local38 |
Percentage of Building Regulations Applications appraised within 3 weeks |
94% |
92% |
93% |
93% |
Green |
|||||||
p22 |
Extend the Shopmobility service to other towns outside Bath |
Do It |
Red |
Dependant on sponsorship funding - not now a possibility until later years |
|||||||||
PLANNING SERVICES |
|||||||||||||
106 |
Percentage of new homes built on previously developed land. |
84% |
63% |
70% |
55% |
Too early to estimate |
NK |
There can be significant differences each year depending on which sites come forward. |
|||||
107 |
Planning cost per head of population |
£7.46 |
£17.40 |
£17.14 |
Less than £17.14 |
NK |
NK |
Detailed work on costs is being carried out in the Best Value Review |
|||||
108 |
Number of advertised departures from the statutory plan approved by the Authority as a percentage of total permissions granted |
0.07% |
0.15% |
0.10% |
Less than 0.2% |
NK |
NK |
This indicator has now been dropped by the Government on the basis that it has no value |
|||||
109 |
Percentage of applications determined within 8 weeks |
71% |
54% |
63% |
68% |
67% |
Amber |
Two long term sickness issues are beginning to impact on performance |
|||||
109a |
Percentage within 13 weeks - major developments [10+ dwellings or larger than 1 hectare] |
NK |
7% |
33% |
45% (local target 30%) |
35% |
Red |
The Council has written to the Minister to explain the difficulty in achieving the 45% in this Authority |
|||||
Ref. |
Indicator |
Top 25% |
2000/ 01 Actual |
2001/ 02 Est/ Actual |
2002/3 Target |
2002/ 03 Estd Out-turn |
Status |
Comment |
|||||
109b |
Percentage within 8 weeks - minor developments [less than above] |
NK |
49% |
59% |
60% |
60% |
Green |
The Government target for B.&N.E.S. in this category is 55% |
|||||
109c |
Percentage within 8 weeks - other [householder, change of use etc.] |
NK |
55% |
67% |
70% |
69% |
Green |
The Government target for B.&N.E.S. in this category is 66% |
|||||
111 |
Percentage of applicants and those commenting on planning applications satisfied with the service received |
84% |
63% |
- |
+10% |
81% |
Green |
The latest user satisfaction survey has shown an increase by 18% in two years |
|||||
112 |
Score against a checklist of planning best practice |
70% |
44% |
67% |
78% |
80% |
Green |
||||||
Local 31 |
Percentage of valid registrations registered within 3 working days |
NK |
NK |
85% |
100% |
92% |
NK |
||||||
Local 32 |
Percentage of neighbours identified at registration notified within 2 days of registration |
NK |
NK |
95% |
100% |
98% |
NK |
||||||
Local 33 |
Percentage of written enforcement complaints acknowledged within 5 working days |
NK |
NK |
92% |
100% |
98% |
NK |
A long term sickness issue and other staff changes have affected this |
|||||
Local 34 |
Percentage of sites subject to enforcement inspection visited within 5 working days |
NK |
NK |
98% |
100% |
98% |
NK |
A long term sickness issue and other staff changes have affected this. |
|||||
P17 |
Submit bids for external funds for the Wildthings Partnership to carry out key activities |
- |
- |
- |
Do it |
Done |
Green |
All bids to date have been successful and have levered in significant levels of funding |
|||||
P17 |
Improve access for all within the Manor Road Community Woodland at Keynsham |
- |
- |
- |
Do it |
Work is currently being carried out |
Green |
Work will be completed by the end of March |
|||||
Ref. |
Indicator |
Top 25% |
2000/ 01 Actual |
2001/ 02 Est/ Actual |
2002/3 Target |
2002/ 03 Estd Out-turn |
Status |
Comment |
|||||
P17 |
Make a bid to the Heritage Lottery Fund to help us continue the successful field boundaries project |
- |
- |
- |
Do it |
The bid has been successful |
Green |
Officer in post June 2002 |
|||||
P17 |
Encourage more schools to take part in Familink visits during Spring 2002 |
- |
- |
- |
Do it |
This has happened during the Spring period |
Green |
Further programme now taking place in the Autumn |
|||||
SUSTAINABILITY & ECONOMIC DEVELOPMENT |
|||||||||||||
Local15 |
Percentage local unemployment below national unemployment |
2.0% |
2.1% |
2.2% |
1.8% |
Red |
Local unemployment unlikely to reduce further as national figure reduces |
||||||
Local16 |
Long term unemployment as a percentage of total unemployment |
38% |
37% |
36% |
22% |
Green |
|||||||
Local17 |
Reduction in unemployment in key wards in B&NES |
4.1% |
3.5% |
3.3% |
Red |
||||||||
Local18 |
Numbers of existing businesses advised |
320 |
320 |
350 |
159 |
Green |
Multiple advice sessions delivered to many of 159 companies |
||||||
Local19 |
Number of potential new businesses provided with training |
215 |
140 |
160 |
212 |
Green |
|||||||
Local20 |
Number of new business starts as a percentage of potential new business trained |
45% |
41% |
45% |
22% |
Business starts slowing down due to downturn in confidence - part of national trend |
|||||||
Local21 |
Average annual room occupancy in hotels and guest houses |
60% |
63% |
65% |
63% |
Amber |
International Tourism affected by world events |
||||||
Local22 |
Average length of stay in hotels and guesthouses [nights] |
1.8 |
1.7 |
1.8 |
1.8 |
Green |
|||||||
Local23 |
Tourism web-site users [www.visitbath.co.uk] (000s) |
166,000 |
250,000 |
272,000 |
Green |
Investment needs to continue to maintain growth. |
|||||||
p22 |
Develop a strategic plan under the Market & Coastal Towns Initiative. This Plan will be reviewed annually by a partnership established to carry forward the initiative in Midsomer Norton, Radstock and their surrounding communities, fourteen in all |
Do It |
Doing it |
Amber |
Project making slow progress. Review in New Year |
||||||||
Ref. |
Indicator |
Top 25% |
2000/ 01 Actual |
2001/ 02 Est/ Actual |
2002/3 Target |
2002/ 03 Estd Out-turn |
Status |
Comment |
|||||
p22 |
The Bath Communities Partnership is seeking external funding to help improve the situation of Bath's Black & Other Minority Ethnic communities, and of residents of the most deprived neighbourhoods in the City, with initial priority given to the Twerton/Southdown area |
Do It |
Done |
Green |
Bid of £1.5M achieved. Setting up partnership and development projects ready for next year |
||||||||
p26 |
Develop and publish an economic development vision and act on the priorities identified in the consultation |
Do It |
Done |
Green |
Part of draft Economic Development Strategy |
||||||||
p26 |
Open the UK's first natural hot spring Spa with the development of the three Spa sites through an innovative partnership venture to revitalise the UK's Spa culture |
Do It |
Green |
||||||||||
p26 |
Introduce a Modern Apprenticeship partnership with City of Bath College to help improve the skill base and development of staff |
Do It |
Red |
Scheme examined and not pursued as not viable |
|||||||||
TRANSPORTATION ACCESS AND WASTE MANAGEMENT |
|||||||||||||
178 |
Percentage of the total length of footpaths and other rights of way that were easy to use by members of the public |
93% |
70% |
73% |
77% |
61.55% |
Amber |
Figures based on two surveys carried out in May 2002 and November 2002 covering in total 5.08% of the network length. |
|||||
WASTE SERVICES |
|||||||||||||
Scope of reporting Area: Policy & strategy relating to waste management throughout the district. Discharging legal responsibilities as a Waste Collection and Waste Disposal Authority. Responsible for the strategic management of the refuse collection & street cleansing contracts. Policy & practice relating to household waste & recycling centres & waste transfer & disposal operations. Specifying, tendering & managing all waste management contracts. Waste awareness, campaigns. Waste education in schools and the community. Policy & strategy relating to the provision of public conveniences. |
|||||||||||||
82a |
Percentage of household waste recycled |
14% |
16% |
18% |
22% |
19% |
A |
Total recycling rate 25%. Target is 30%. Plastics expansion to be phased in December. |
|||||
82b |
Percentage composted |
4.2% |
5% |
5% |
8% |
6% |
A |
Delays in implementing SITA trials due to late publication of DEFRA risk assessments. |
|||||
Ref. |
Indicator |
Top 25% |
2000/ 01 Actual |
2001/ 02 Est/ Actual |
2002/3 Target |
2002/ 03 Estd Out-turn |
Status |
Comment |
|||||
82c |
Percentage used to recover heat, power and other energy sources |
0% |
0% |
0% |
0% |
0% |
G |
||||||
82d |
Percentage landfilled |
79% |
79% |
77% |
70% |
75% |
A |
Recycling rate below target of 30%. Currently recycling 25% of waste. |
|||||
84 |
Number of kilograms of household waste collected per head |
466kg |
489kg |
492kg |
492kg |
495kg |
A |
Target is zero growth per annum, so is revised annually based upon last years actual. |
|||||
85 |
Cost per square kilometre of keeping relevant land, for which the local authority is responsible, clear of litter and refuse |
£36180 |
£102437 |
£102437 |
Not applicable Indicator ceased. |
N/A |
N/A |
||||||
86 |
Cost of waste collection per household |
£25.66 |
£24.06 |
£34.11 |
£34.11 |
£34.11 |
A |
Costs now include costs of refuse collection & costs of recycling collections combined. Previously just refuse collection costs. Actual figure is calculated from year end RO figures. |
|||||
87 |
Cost of waste disposal per tonne for municipal waste |
£27.17 |
£50.30 |
£49.95 |
£50.95 |
£50.95 |
A |
Actual figure based on year end RO figures including overheads. £1 per tonne increase in landfill tax |
|||||
88 |
Number of collections missed per 100,000 collections of household waste |
28 |
172 |
116 |
92 |
G |
No longer reported nationally, but retained as a local indicator. . |
||||||
89 |
Percentage of people satisfied with cleanliness standards |
71% |
67% |
68% |
Not known |
Satisfaction indicators not assessed as yet. To be measured corporately. |
|||||||
Local24 |
Street Cleanliness standards [Tidy Britain Group's CIMS index] |
67% |
81% |
82% |
71% |
A |
Above average results. To be compared with 2000/01 results as both were carried out by independent body. 2001/02 carried out by neighbouring LA officers. |
||||||
90a |
Percentage expressing satisfaction with household refuse collection |
90% |
80% |
Top25% |
Not known |
Satisfaction indicators not assessed as yet. To be measured corporately. |
|||||||
90b |
Percentage expressing satisfaction with recycling facilities |
73% |
77% |
Top25% |
Not known |
As above |
|||||||
Ref. |
Indicator |
Top 25% |
2000/ 01 Actual |
2001/ 02 Est/ Actual |
2002/3 Target |
2002/ 03 Estd Out-turn |
Status |
Comment |
|||||
90c |
Percentage expressing satisfaction with waste & recycling centres |
77% |
77% |
Top25% |
Not known |
As above |
|||||||
91 |
Percentage of population served by a kerbside collection of recyclables or within 1 kilometre of a recycling centre |
100% |
100% |
100% |
100% |
100% |
G |
||||||
P17 |
Must contain all relevant commitments in Performance Plan plus others in the current year Service Plan. Should not include performance indicators. |
Do it |
Green, Amber, Red |
On Target; Reasons for expected non-achievement |
|||||||||
P17 |
Adopt a waste strategy with stringent recycling targets in order to aspire to our long term vision. |
Do it |
amber |
Zero waste strategy to be developed alongside core waste management strategy document. A draft strategy has been adopted which details stringent recycling targets |
|||||||||
P17 |
Trial kerbside collections of organic waste (food waste, garden waste and cardboard) for composting |
Do it |
green |
Trials commenced Oct 2002 for 12 months |
|||||||||
P17 |
Implement a comprehensive waste awareness campaign in partnership with Avon Friends of the Earth using external funding allocated by waste management companies |
Do it |
green |
Funding allocated for a 2 year period. Campaign commenced in 2002. |