Meeting documents
Cabinet
Wednesday, 5th February, 2003
Appendix 1 - Plan and Pressure
Changes to Existing Draft Financial Plan Items |
Next year |
|||||||||
Existing or New Reference |
Lead Director |
Portfolio |
Service |
Description |
Amount previously shown as a pressure or existing budget in previous list £000's |
Suggested new amount to be incorporated in budget in 2003/04 £000's |
Change in base plan (already incorporated) in 2003/04 £000's |
New change 2003/04 £000's |
Capital £000's |
Source/Notes |
Previous Pressures List |
||||||||||
19 |
JA |
SH |
Housing |
Housing - Homelessness - ongoing overspend - reduced by £25k |
100 |
75 |
-25 |
Real cost pressure |
||
41 |
SB |
NO'F |
Libraries |
Libraries - Staffing costs of People's Network ( £45k). Cost reduced by £10k. |
45 |
35 |
-10 |
Capital costs provided by New Opportunities Fund but no revenue costs. Ongoing running costs difficult to estimate, but may create additional pressures over and above staffing costs. |
||
46 |
JH |
RT |
Revenues and Benefits |
Revs & Bens - IT system costs -Sx3 software is the core system used for Council Tax and Benefits administration. The Software supplier has re-developed the core product and will not support the existing product from October 2003. Original £100k funded from capital. Latest estimate says cost will be higher - say up to £175k. |
100 |
175 |
75 |
175 |
To upgrade will cost in the region of £100k. To replace with another system would cost in the region of £200k. Indications are that whilst replacement would be more expensive the comparable Support and maintenance costs from alternative suppliers are around £50k pa cheaper if NNDR is included. To replace with another system would cost in the region of £200k |
|
64 |
JH |
GD |
Property - Corporate Estate |
Corporate Estate - Asset Management Planning |
120 |
0 |
-120 |
Assumed to be absorbed within R&M budget, net of other effects in anticipated 2003/04 budget, such as the Leisure Transfer. |
||
83 |
PR |
RT |
Operations - non trading |
Linear Way - Current budget for Linear Way includes re-organisation and development budget. This is unlikely to be spent in 02/03 and requires carrying forward to 03/04. |
0 |
80 |
80 |
A carry forward of an existing budget of £80k. Pending a firm longer term solution to Linear Way accommodation, unspent re-organisation/development budget should be carried forward. |
||
85 |
PR |
NO'F |
Operations - Parks and Cemeteries |
Cemeteries & Crematoria - Health and Safety `topple testing and associated remedial works'. Cost of on-going testing (£120k pa) with as yet unknown remedial cost liability - could be significant. FURTHER REDUCTION OF THIS SUM FROM £125 to £80k IN DEC 02 with careful risk management. |
125 |
80 |
-45 |
Health and Safety at cemeteries is becoming a national issue RE: unsafe memorials following 3 deaths nationally. The Health & Safety Executive have said "it is incumbent that Authorities provide safe cemeteries." The Councils own Health & Safety officers are fully supportive of the need to inspect and make safe old and unsafe memorials as this is a significant risk which is currently not managed. The Council would be held liable and incur significant costs should an accident occur and the position remains unaddressed. A three year programme of inspection at all B&NES cemeteries will cost £120k p.a. with on-going testing thereafter approximately £40k-£50k p.a. Whilst remedial action costs are as yet unknown, we should make a provision for £70k per annum over the first three years and approximately £30k thereafter. New memorials are now laid in accordance with updated national regulations. A detailed report is in production for consideration by the Director's Group. |
||
91 |
PR |
NO'F |
Operations - Sports and Leisure |
Leisure - Lottery Bid - financial plan funding required deferment to 03/04. Cost neutral item - rephased. |
0 |
25 |
25 |
Lottery funding for Chew Valley school may not be required until 03/04 as their initial timescales have slipped. Funding will be required in 03/04. Budget of £25k should be moved to 03/04. If spent this year - will carry the overspend fwd to match the budget. |
||
56 |
All |
All |
Various services |
Other areas - e.g. inflation above 3% in certain contracts - around £250k possible, other areas still possible |
300 |
215 |
-85 |
Contract information received has meant a slight reduction is possible in these additional costs. |
||
62 |
JH/ Corp |
GD |
Corporate -Commercial Estate |
Growth in income is anticipated at around £75k per annum for the next two years and around £350k for 05/06, based on current market expectations. Given that the current inflation target for the Commercial Estate is £250k per annum there will be a likely shortfall to the Financial Plan of £175k 03/04 plus an existing budget shortfall of £200-£300K, (deficit met in 02/03 by change in accounting policy), £350k 04/05 and £250k 05/06 based on current prices. |
500 |
450 |
-50 |
|||
101 |
CT |
SH |
DEEDS - Environmental Services |
STOP NOW ORDERS" and Modernisation Funding for Consumer Protection £3 million nationally. This equates to approximately £8,500.00 pro rata. This is already funded in the base financial plan so an additional provision is not required or it will be double counted. |
9 |
0 |
9 |
-9 |
THIS IS EXTRA FUNDING TO PROVIDE EXTRA ADVICE/ENFORCEMENT EXPECTED FOR PUBLIC/TRADE ALIKE. AGAIN, THE EXPECTED P.I's FOR TRADING STANDARDS ARE TO BE INCREASED IN LINE WITH THIS INCREASED RESOURCE. HENCE IT IS LIKELY THIS SERVICE WILL FAIL TO MEET ITS TARGETS WITHOUT THE INCREASE BEING PASSED ON. %age national EPCS SSA = 0.27% |
|
102 |
CT |
SH |
DEEDS - Environmental Services |
Extra Feeding Stuffs samples required £2.5m nationally. Equates to £7.5k pro rata. This is already funded in the base financial plan so additional provision not required or will be double counted. |
8 |
0 |
8 |
-8 |
THIS IS EXTRA FUNDING TO PROVIDE EXTRA SAMPLING. THIS SERVICE IS LIKELY TO FAIL TO MEET ITS TARGETS IN 'PUBLIC PROTECTION' WITHOUT THIS EXTRA RESOURCE. IT CANNOT BE FOUND WITHIN THE EXISTING PROVISION. %age national EPCS SSA = 0.27% |
|
Various |
All |
Miscellaneous |
All other items previously listed that remain unchanged |
1,047 |
1,047 |
0 |
0 |
|||
Total of Previous Pressures Listed |
2,353 |
2,182 |
16 |
-171 |
||||||
Changes to items built into the base plan |
||||||||||
26 |
All |
All |
All Services |
Pay and NI, and other net inflation on base model - review for impact of SSA passporting in Social Services and Education - £100k in total from this item and item 98 |
1,035 |
1,000 |
0 |
-35 |
£800k for pay awards 02/03 (full year effect) + £400k for NI (some in ops and property). Catering and Cleaning bear the brunt of the minimum wage award - estimated £227K impact in 03/04 - funding of this amount needs to be explicit in these figures. However payment (and hence provision) of some of these additional costs is within "passported" sum for Education. |
|
31 |
JH |
RT |
Corporate - Interest on balances |
Interest on balances |
200 |
200 |
0 |
Also see report section 3. |
||
70 |
JH |
GD |
Client cost to Corporate Estate |
Increase in cleaning staff pay is likely to result in increased office cleaning costs. See item 26 above also |
50 |
50 |
0 |
Part of pay inflation provision |
||
98 |
PR |
GC |
Client cost to Education |
The recent pay award negotiations, implementing a £5.10 p.h. minimum wage, has increased staff costs substantially in the catering and cleaning traded services. See item 26 above also - Reduced for that within passport |
65 |
0 |
-65 |
Cleaning increased costs (£75k for 02/03 - 6 months only) will be passed on to users in increased charges. Catering increased costs (approx. £95k) will be managed by a combination of increased sales targets, cost reductions and negotiating additional funding (£65k) for the Primary Schools meals contract from Education. |
||
105 |
CT |
RS |
DEEDS - Planning |
PTE15 - Local Plan - Rephasing request to £75k in 03/04 and £255k in 03/04 (shift of £135k to 04/05 - Inquiry due). |
-75 |
-75 |
-75 |
0 |
savings of £60k in 02/03 to fund so is cost neutral revision in base plan |
|
Total of Previous Pressures Listed |
1,275 |
1,175 |
-75 |
-100 |
||||||
Suggested new Items to be included: |
||||||||||
SS6a |
JA |
JT |
Elderly Social Services |
Rephase the spending in the plan (was in draft plan to Council of 23rd January). Rephase £93 k into 2003/04 (in base plan) |
0 |
93 |
93 |
0 |
||
Corp 33 and 34 |
JE |
RT |
Corporate |
Legal Challenges - fund from balances 03/04 - continuing legal and audit costs - one off in 03/04. |
0 |
100 |
100 |
0 |
||
Corp 33 and 34 |
Corp |
RT |
Corporate |
Funding legal challenges cost from balances in 03/04 |
0 |
-100 |
-100 |
|||
RCC15 |
SB |
RT |
All Corporate Director areas |
Do not reinvest 1% efficiency savings |
43 |
0 |
-43 |
0 |
No reinvestment of efficiency savings |
|
Corp 6 |
SB |
RT |
Human Resources |
Training and Organisational Development |
125 |
80 |
-45 |
Reduce development |
||
Corp 2 |
SB |
RT |
Corporate |
Community Strategy |
40 |
32 |
-8 |
Reduce development |
||
Corp 36 |
SB |
RT |
Corporate |
Take saving in Chairman's allowance in 2002/03 (one off) |
15 |
0 |
-15 |
|||
RCC19 |
SB |
RT |
Human Resources |
HRS Upgrade (one off - 2002/03 allocation) |
45 |
25 |
-20 |
Reduce development 2002/03 only |
||
New Item - SSA change |
RT |
Corporate - Benefit costs |
Benefit Admin Grant transferred from SSA to grant - net effect after transfer of implications on benefits of Working Families Tax Credit (WFTC) work |
0 |
-286 |
-286 |
||||
RCC10a |
GD |
Corporate Estate - Risk assessment followed by programme of works to improve disability access to Council buildings and ensure compliance with Disability Discrimination Act (DDA) - reduction in £174k revenue suggested, reinstating the £26k funding removed in DEEDS 2% savings for an access officer and leave £175k capital provision. |
200 |
26 |
-175 |
One off reduction. There is capital funding in 2003/04 and a backlog of work, so this reduction would allow "catch up" |
||||
PTE 51 |
CT |
PM |
Transportation |
Access Management - Provision of quality partnership to include free elderly bus fares to over 75's. Reinstatement of travel tokens for elderly - Defer implementation because of escalated costs. |
305 |
60 |
-245 |
|||
New - ES 40 |
CT |
SH |
DEEDS - Environmental Services |
Enterprise Act -SSA transfer |
0 |
13 |
13 |
Overhaul of Consumer Protection - DTI letter 20 Dec 02 £5m national funding pro rata, increasing to £10m in 04/05. However SSA totals are 4.3m so are not same as DTI. This is £4.3m pro rata, doubled in 04/05 |
||
Corp1 |
RT |
Corporate |
General Contingency - reduced by £300k ongoing. |
300 |
0 |
-300 |
0 |
This was originally included as a contingency against the SSA review results |
||
Corp10 |
RT |
Corporate - Debt Charges and Interest |
Interest on Balances - Net loss of interest earned due to capital programme spending - offset by savings in Ex-Avon debt - Extra capital spend costs add £75k in 03/04, £350k in 04/05 and £580k in 05/06 |
0 |
75 |
75 |
0 |
Depends on actual spend and interest rates etc |
||
Corp 34 |
All |
Corporate |
Replenishment of Balances gradually to increase in line with overall Council risk assessment. Original plan was to increase by £700k to 3% but now propose to build balances over a longer timescale. |
700 |
450 |
-250 |
Replenish balances because of awareness and effects of risks that have affected the Council in 2001/02 such as flooding, foot and mouth and tourism reductions. |
|||
New |
Corp |
RT |
Corporate - Housing Benefits |
Housing Benefit Grant for supporting people - transfer from SSA to specific grant - latest estimate is 5% of £3m benefit cost. |
0 |
-150 |
-150 |
|||
New |
Corp |
N/A |
Corporate |
Shift from revenue financing of capital to Capital |
0 |
-200 |
-200 |
200 |
To fit with capital resource plan |
|
New |
Corp |
RT |
Corporate - Unfunded pensions |
Unfunded Pensions reduction to £1,610k |
1,654 |
1,610 |
-44 |
0 |
||
Total of Changes to Pressures Listed |
3,427 |
1,828 |
-219 |
-1,381 |
||||||
Total of Previous list (see Appendix 3 of F Plan report 15 Jan) |
2,353 |
2,182 |
16 |
-171 |
||||||
Additional capital funding |
0 |
0 |
0 |
-75 |
||||||
Total of changes to items built into the base plan (as listed in F Plan report 15 January) |
1,275 |
1,175 |
-75 |
-100 |
||||||
Total of new changes recommended |
3,427 |
1,828 |
-219 |
-1,381 |
||||||
Total changes suggested to developments are (£k) |
7,055 |
5,185 |
-278 |
-1,727 |
||||||
To report table 1 |
Appendix 2 - extra savings
List of Additional Savings Proposals |
||||||
No. |
Item |
Rationale |
Revenue Saving(-) /cost (+) £k in 2003/04 |
Staff Impact |
Portfolio |
|
Service Rev |
Support Services Impact |
|||||
NON PASSPORTED SERVICES |
||||||
HOS/Director: |
Louise Tester |
|||||
CP 1 |
Increase CIS income |
Find new sources of external income to contribute towards web costs |
9 |
E-government, BV and customer Satisfaction |
||
Service: |
Registration Service |
HOS/Director: |
Graham Russell |
|||
RS1 |
Increase income in registration service |
Increase income from weddings |
5 |
0 |
None |
RT |
Service: |
Strategic Res Plng & Business Services |
HOS/Director: |
Phil Hall |
|||
A3 |
Delete vacant post in Financial Accounts |
Has proved possible to manage day-to-day work within reduced resources. But saving already identified in FMS 2004 saving, so one-off only. |
25 |
0 |
None |
RT |
Service: |
Revenues & Benefits |
HOS/Director: |
Ian Savigar/Jean Hinks |
|||
4 |
Use alternative methods of taking cash at cash offices to reduce staffing costs |
Providing secure cash offices is expensive in both staff resource and security requirements - automated machines could provide an equivalent service |
25 |
Need to ensure interfaces with Cash Receipting & FMS systems |
Potential for reduction or re-deployment |
RT |
Service: |
Resources Director |
HOS/Director: |
Jean Hinks |
|||
New 3 |
Housekeeping savings |
Look for small savings in various areas of resources |
20 |
Yet to be identified |
RT |
|
Service: |
Operations Director |
HOS/Director: |
Peter Rowntree |
|||
New 4 |
Savings in various areas yet to be identified |
Needs some further discussion before a definite proposal is put forward |
12 |
Yet to be identified |
RT |
|
Service: |
Public Protection |
HOS/Director: |
Howard Nowell |
|||
New item |
Increase Environmental and Consumer Services Income |
30.00 |
SH |
|||
Service: |
Direct Services |
HOS/Director: |
Matthew Smith |
|||
New item |
Reduce specification of Cleaning in Offices |
This requires co-operation amongst users including members, so that cleaning standards are reduced responsibly and reasonable savings appear |
15 |
|||
New Item |
transfer staff to fulfil other pressures - |
e.g. parks strategy (unlikely to be resignations hence redundancy would be expensive). £20K saved but risky |
20 |
|||
Service: |
Heritage Services |
HOS/Director: |
Stephen Bird / Peter Rowntree |
|||
2 |
Reduce support to independent museums |
20.0 |
TLC |
|||
4 |
Reduce print costs of open week / community events |
10.0 |
TLC |
|||
All Directors |
||||||
new |
Savings yet to be identified |
Savings yet to be identified |
28.5 |
TLC |
||
Total of all new additional savings |
219.5 |
|||||
PASSPORTED SERVICES - Social Services |
||||||
Savings required in addition to 2% to meet passported sum plus £220k in 2003/04. |
||||||
Service: |
Children and Families |
HOS/Director: |
Maurice Lindsay |
|||
13 & 15 |
Consolidate Children's Planning & Management arrangements |
Budget reductions lead to merging of services. |
44 |
0 |
1 |
JT |
Merger of the two Bath-based Family Centres |
Ensures that there is provision of at least one family centre in each major centre of population |
50 |
potential redundancies |
JT |
||
Service: |
Social Services - Adult Care |
HOS/Director: |
Nick Harris |
|||
8 |
Close Greenacres |
Already happened but required to be put back in 2004/05 for EPH reprovision |
300 |
JT |
||
Closure of Homeward Unit |
175 |
potential redundancies |
JT |
|||
13 |
Supporting people |
This is income received for people with learning difficulties in supported living schemes. |
200 |
0 |
nil |
JT |
Drugs Action & Community Safety |
To be identified |
14 |
SH |
|||
5 |
Reduce Voluntary Grants |
Mainly achieved through transfer of responsibility from grants budget to Supported People funding |
60 |
0 |
JT |
|
Total Savings found to meet passporting requirements plus £220k |
843 |
|||||
PASSPORTED SERVICES - Education |
||||||
Education pressures and the resulting savings required would be met within the passport sum and reported within Education Budget Forum |
||||||
Appendix 3
List of Savings and Reinvestment Proposals |
||||||||
IN ALL CASES SAVINGS PROPOSED ARE PROPOSED TO FUND THE DEVELOPMENTS LISTED AFTER THEM. |
||||||||
No. |
Item |
Rationale |
Revenue Saving(-) /cost (+) £k in 2003/04 |
Capital Cost (+) £k overall |
||||
Service Rev |
Support Services Impact |
Service Capital |
When? |
Staff Impact |
Portfolio |
|||
Resources Services |
||||||||
It is proposed that the following savings |
||||||||
R1 |
1% Reinvestment not used for all Resources Directors' areas of service |
Reprioritise money within services |
-74 |
See Appendix 4 |
GD and RT |
|||
R2 |
The efficiency savings will be achieved from the service areas. Rating Appeals - Property |
Reprioritise money within services |
-86 |
N/A |
01.04.03 |
N/A |
GD |
|
Total |
-160 |
0 |
0 |
|||||
To fund the following items |
||||||||
R3 |
Emergency management - Emergency Management Unit's revenue budgets due to reduction in central government grant. |
The formula has not yet been agreed by government, but there is every indication that this is likely to reduce the grant to this Council by about £9,000 in 2003/04 and a further £5,000 in 2004/05. Plus it has now been acknowledged that the Emergency Management Unit is Under funded in its current base budgets by £20k, when compared with the duties expected of the department. The government has increased the duties of Council Emergency Management Units in various areas since the September 11th atrocity: this requires additional man-hours, but has not been matched by increased funding. The effect was masked in 2001/02 due to the additional duties being advised relatively late in the financial year, and by a one-off high grant settlement in 2001/02. £34k ongoing pressure. |
29 |
RT |
||||
R4 |
RCC17 in Revenues and Benefits - savings will not be achieved in 2002/03 and 2003/04 |
Delay in moves in office accommodation and higher transition costs than anticipated. Is also £95k shortfall in 2002/03. |
95 |
RT |
||||
Total |
Call logging system for EMU |
6 |
0 |
0 |
None |
RT |
||
Cumulative total |
130 |
0 |
0 |
|||||
Net Total (- is saving) in Resources |
-30 |
|||||||
DEEDS |
||||||||
It is proposed that the following savings |
||||||||
D1 |
1% Reinvestment not used for all DEEDS areas of service |
Reprioritise money within services |
-292 |
See Appendix 4 |
SH,PM and RS |
|||
Service: |
Public Protection |
HOS/Director: |
Howard Nowell |
|||||
D7 |
Remove Non-Statutory Element(s) of Service (Shopmobility) |
Non statutory service, but providing highly valued service to the disabled and carers. |
-38.0 |
Summer 2003 |
2 potential redundancies |
SH |
||
D8 |
Increased Building Control Fee Income |
Supported by buoyant (currently) property market. |
-10.0 |
01.04.03 |
None |
SH |
||
Service: |
Waste |
HOS/Director: |
Richard Robertson |
|||||
D21 |
Reduce the number of public conveniences. |
Reduce the provision of public conveniences (Non statutory) |
-100.50 |
Y Direct Services |
01/04/20003 |
Up to 6 potential redundancies |
RS |
|
Total |
-440.50 |
|||||||
To fund the following items |
||||||||
D21a |
Shortfall in Income re Accommodation Booking Fees SERVICE PRESSURE |
20 |
NO'F |
|||||
D25 |
Concessionary Fare Scheme Review including potential use of Taxi's |
50 |
PM |
|||||
D22 |
Hit Squad for Sign Maintenance |
} All to improve transportation service |
30 |
PM |
||||
D23 |
Appoint Street Works co-ordinator |
22 |
PM |
|||||
D24 |
Develop UK Pavement Management System (including full highway inventory) |
61 |
PM |
|||||
D26 |
Highway Maintenance |
49 |
PM |
|||||
D27 |
Enhanced Resources to deliver Transport Planning Function |
90 |
PM |
|||||
D28 |
Transportation Business Plan - assumed reinvestment of 1% efficiency saving, but with first year saving £50k. |
242 |
PM |
|||||
Total Investment |
564 |
|||||||
Net cost EEDS |
123 |
|||||||
OPERATIONS DIRECTOR |
||||||||
It is proposed that the following savings |
||||||||
Service: |
Direct Services (Non Trading) |
HOS/Director: |
Angela Parratt |
|||||
O2 |
Reduction in external inspection fees |
Does not affect quality or breadth of BV programme |
-45.0 |
nil |
N/A |
2003/04 |
GD |
|
Service: |
Direct Services |
HOS/Director: |
Matthew Smith |
|||||
O9 |
Reduce emergency budget by 20% |
Budget used for parks unforeseen vandalism, repairs, response to queries/complaints |
-10.0 |
0 |
0 |
2003-4 |
NO'F |
|
O8 |
Delete general contingency fund HG10 (this and item 10 below offset carpet bedding saving) |
Budget previously used for unpredicted spend and items controlled by Head of service (e.g. publicity) |
-20.0 |
0 |
0 |
2003-4 |
NO'F |
|
O10 |
Reduce sports ground reinstatement / maintenance budget by 20% |
Budget used for repair works & ensuring that pitches are kept playable |
-6.0 |
0 |
0 |
2003-4 |
NO'F |
|
Service: |
Leisure Services |
HOS/Director: |
John Howey |
|||||
2 |
Undertake no further strategic research |
-4.0 |
Nil |
2003-4 |
NO'F |
|||
3 |
Transfer 2 football pitches in Nortn-Radstock to Town Council |
£10k p.a. savings from 2004/05 |
3.0 |
Nil |
2003-4 |
NO'F |
||
5 |
Cease publication of Leisure Directory |
-7.0 |
Nil |
2003-4 |
NO'F |
|||
Total |
-89.00 |
|||||||
To fund the following items |
||||||||
89 |
Implementing the Parks BV review action plan - development of a 'Park Strategy' |
20 |
0 |
NO'F |
||||
90 |
Implementing a step change to Parks - an environmental and sustainable approach |
33 |
0 |
NO'F |
||||
5 |
Reinstate Efficiency saving of cessation of carpet bedding (3D schemes) |
Most costly form of floral decoration. |
26.0 |
0 |
0 |
2003-4 |
NO'F |
|
92 |
PR |
Leisure Externalisation - Redundancy and pension costs associated with Leisure externalisation (£150k approx.) |
150 |
0 |
Leisure externalisation will save the Council at least £2.5m - £3.75m revenue over a 10-15 year contract period and is already built into the base financial plan. Residual leisure functions and contract monitoring will transfer to Direct Services. This will result in mgt redundancies (two posts) and pension costs in current Leisure structure. The salary cost savings are already assumed in the Operations Financial recovery plan. |
NO'F |
||
93 |
PR |
Leisure Externalisation - PPP/NPDO contractor monitoring costs not funded through financial plan (£35k) |
35 |
0 |
NO'F |
|||
94 |
PR |
Effects of Leisure externalisation on Operations traded services. Loss of current contribution (£56k) to overheads - some or all of it which may not be saved to compensate |
30 |
0 |
NO'F |
|||
The above 'externalisation' pressures will be funded from savings resulting from the project. |
||||||||
PR |
Savings arising from externalisation project |
-215 |
0 |
NO'F |
||||
Net developments |
79.00 |
|||||||
Net savings (above) |
-89.00 |
|||||||
Net savings - Operations |
-10 |
|||||||
Total of all proposals in this Appendix |
||||||||
Resources areas |
Net saving |
-30 |
||||||
EEDS areas |
Net cost |
123 |
||||||
Operations areas |
Net saving |
-10 |
||||||
Total of all proposals |
83 |
App 4 - Efficiency savings
2% Efficiency Savings Proposals |
||||||||||
Cash Limit - Allocation in App 1 |
||||||||||
2003/04 Budget |
||||||||||
No. |
Item |
Rationale |
Revenue Saving(+) /cost (-) £k in 2003/04 |
Capital Cost (-) £k overall |
||||||
Service Rev |
Service Capital |
Support Costs, i.e. IT, Accom, property |
When? |
Staff Impact |
Portfolio |
|||||
Savings required of 2% to meet passported sum plus £220k in 2003/04. |
||||||||||
Service: |
Children and Families |
HOS/Director: |
Maurice Lindsay |
|||||||
1 |
* Reduce grant allocation for care leavers service. |
The level of funding required for this new government initiative is not as great as expected. |
30 |
0 |
0 |
Apr-03 |
nil |
JT |
Not allocated |
|
2 |
* Reduce allocated budget for B&NES fostering allowances. |
This is one of the larger budgets within the service. |
50 |
0 |
0 |
Apr-03 |
nil |
JT |
Not allocated |
|
3 |
* Delete salaried foster carer post. |
Post reviewed and not previously met desired outcomes. |
15 |
0 |
0 |
Apr-03 |
1 fte vacant post |
JT |
Not allocated |
|
4 |
* Equipment and stationery budgets. |
Office relocations will mean reduced need for equipment purchasing in short term |
14 |
0 |
0 |
Apr-03 |
nil |
JT |
Not allocated |
|
5 |
* Savings within early years provision and commissioning |
This is one of the larger budgets within the service. |
10 |
0 |
0 |
Apr-03 |
nil |
JT |
Not allocated |
|
6 |
* Reduce out of hours contact Service to foster carers. |
Current arrangement not meeting expected outcomes. Future arrangements to be made WER. |
6 |
0 |
0 |
Apr-03 |
nil |
JT |
Not allocated |
|
7 |
*Quality Protects Map publication costs. |
- Not required to publish MAPS for 03/04 |
5 |
0 |
0 |
Apr-03 |
nil |
JT |
Not allocated |
|
8 |
* Savings within 117 Project budgets |
Able to make savings within this budget which is one of our larger budgets. |
5 |
0 |
0 |
Apr-03 |
nil |
JT |
Not allocated |
|
9 |
* Reduce training budget available to HoS. |
Least impact on service training needs. |
1 |
0 |
0 |
Apr-03 |
nil |
JT |
Not allocated |
|
JT |
||||||||||
Total |
existing SLA does cease April 03. |
136 |
0 |
0 |
||||||
Service: |
Social Services - Adult Care |
HOS/Director: |
Nick Harris |
|||||||
1 |
Cease night service |
Already Planned |
139 |
0 |
0 |
In Progress |
3 redundancies |
JT |
Not allocated |
|
2 |
Capitalise IT consumables |
Capital provision for Healthy Living Centre no longer required. This would require amendment to capital programme |
20 |
capitalising of revenue costs |
0 |
Apr-03 |
nil |
JT |
Not allocated |
|
3 |
Capitalise OT equipment |
see above |
38 |
see above |
0 |
Apr-03 |
nil |
JT |
Not allocated |
|
Total |
197 |
0 |
0 |
|||||||
Service: |
Social Services Other |
HOS/Director: |
Jane Ashman |
|||||||
1 |
Equipment budget |
Move to new offices should mean reduction in replacement furniture needs |
10 |
0 |
0 |
Apr-03 |
none |
JT |
Not allocated |
|
2 |
DSO Consultancy |
Consultancy and advice provided by Commercial services to residential and day care establishments to improve efficiency and effectiveness of food delivery. Change of focus in establishments and EPH review should lessen the impact of this reduction. |
20 |
0 |
0 |
Apr-03 |
vacant post in commercial services |
JT |
Not allocated |
|
3 |
Directors Budget |
Savings due to income from PCT for work of Director on Board. |
5 |
0 |
0 |
Apr-03 |
none |
JT |
Not allocated |
|
4 |
Transport Budget |
No provision for emergency replacements |
5 |
0 |
0 |
Apr-03 |
none |
JT |
Not allocated |
|
Total |
40 |
0 |
0 |
|||||||
Service: |
Community Safety & DAT |
HOS/Director: |
Jane Ashman |
|||||||
1 |
Reduce Partnership Development Fund by 25% |
This funding is not committed to staff costs but covers training, information, publications etc |
2.5 |
none |
none |
April 2003 - onwards |
none |
SH |
Not allocated |
|
2 |
Reduce contribution to Community Initiatives Fund by two thirds |
Small grants fund so no cut to existing services |
2.0 |
none |
none |
April 2003 - onwards |
none |
SH |
Not allocated |
|
3 |
Reduce DAT running costs by 80% |
This is the only possible cut which does not directly impact on provision of drug treatment |
7.5 |
none |
none |
April 2003 onwards |
none |
SH |
Not allocated |
|
Total |
12 |
0 |
0 |
|||||||
Service: |
Housing |
HOS/Director: |
Jayne Shayler |
|||||||
1 |
Hold Group Manager post vacant |
Action can be taken on short term pending clarification of longer term management arrangements for the service |
35 |
0 |
0 |
Apr-03 |
1 fte |
SH |
Housing |
|
Total |
35 |
0 |
0 |
|||||||
Service: |
IDS |
HOS/Director: |
Matthew Smith |
|||||||
Option 1 - savings of 2% (IDS Target £12000) |
||||||||||
1 |
Increase income through project work |
Reorganisation of staff (mid 2002) increased efficiency & opportunity to generate income. This item assumes that Paris does not proceed and IDS takes opportunity to get income from external sources. |
12 |
0 |
0 |
2003/4 |
Nil |
RT |
IDS |
|
Total |
12 |
0 |
0 |
|||||||
Service: |
Strategic Res Plng & Business Services |
HOS/Director: |
Phil Hall |
|||||||
A1 |
Manage payment dates so that supplier invoices are paid on 30-day target and not before |
Improved cashflow while still meeting targets |
20.5 |
0 |
0 |
2003 |
nil |
RT |
Interest on balances |
|
A2 |
Bring forward transfer of cheque printing from IDS to Business Services |
Possible to absorb extra work within existing resources. But saving already identified in FMS 2004 saving. |
20 |
0 |
0 |
2003 |
Redeployment or redundancy in IDS |
RT |
Res - Business Services |
|
Total |
40.5 |
0 |
0 |
|||||||
Service: |
Property Services |
HOS/Director: |
TAMM / JH |
|||||||
1 |
The efficiency savings will be achieved from various service areas. |
From rating appeals on business rates, use of agency staff and the impact of customer access. |
17 |
n/a |
01.04.03 |
n/a |
GD |
Property Services |
||
Total |
17 |
0 |
0 |
|||||||
Service: |
Property Services (Repairs & Mtce) |
HOS/Director: |
TAMM / JH |
|||||||
1 |
Repairs & maintenance |
To reduce spending to meet budget cuts |
53 |
n/a |
n/a |
01.04.03 |
One FTE will have to undertake additional fee earning work |
GD |
Repairs & Maintenance |
|
Total |
53 |
0 |
0 |
|||||||
Service: |
Revenues & Benefits |
HOS/Director: |
Ian Savigar/Jean Hinks |
|||||||
1 |
Reduce the number of PC's by 8 |
Hot desking at Plymouth House reduces need for number of PC's |
8.5 |
0 |
0 |
Apr-03 |
Loss of training room PC's makes training more difficult |
RT |
Revenues & Benefits |
|
2 |
Stop using Somer Housing Rent Collectors |
Somer Housing may remove the Service under Health & safety requirements |
10 |
Apr-03 |
None |
RT |
Revenues & Benefits |
|||
3 |
Reduce stationery budget |
Paperless working reduces the need |
7 |
Apr-03 |
None |
RT |
Revenues & Benefits |
|||
Total |
25.5 |
0 |
0 |
|||||||
Service: |
Highways & Access |
HOS/Director: |
Steve Howell |
|||||||
1 |
Reduce SLA Costs |
2% saving is to be applied to all support services through reduced cost of SLA |
5.70 |
0 |
0 |
1-Apr |
nil |
Highways |
||
2 |
Increased fees & charges |
Increased income through raising charges for lines signs and licences |
5.00 |
0 |
0 |
1-Apr |
Highways |
|||
3 |
Reduce Car Allowances |
manage travelling allowances across the service |
10.80 |
0 |
0 |
1-Apr |
Highways |
|||
4 |
Reduce level of Winter Maintenance |
reduce the length of gritting routes - likely to be within Bath where there is extra coverage |
10.00 |
0 |
0 |
1-Apr |
Highways |
|||
5 |
Reduce maintenance of highway depots |
reduced maintenance - short term answer - long term problem of deteriorating asset |
5.00 |
0 |
0 |
1-Apr |
Highways |
|||
6 |
Reduce reactive maintenance on bridges. |
reduced maintenance - short term answer - long term problem of deteriorating asset |
3.00 |
0 |
0 |
1-Apr |
Highways |
|||
7 |
Reduce Reactive Highway Maintenance & Street Lighting |
large service budget will be a cut in the provision of reactive maintenance |
97.36 |
0 |
0 |
1-Apr |
Highways |
|||
Total |
136.86 |
0 |
0 |
|||||||
Service: |
Parking |
HOS/Director: |
Steve Howell |
|||||||
1 |
Reduce SLA Costs |
2% saving is to be applied to all support services through reduced cost of SLA |
24.50 |
0 |
0 |
Apr-03 |
Car Parking |
|||
2 |
Extend evening charges to 7pm & Sunday on street charging |
Links to extend time period for residents parking |
50.00 |
0 |
0 |
Jul-03 |
Car Parking |
|||
3 |
Increase in Excess Charge Fee Income re VAT |
higher levels of enforcement of offences |
30.00 |
0 |
0 |
Apr-03 |
Car Parking |
|||
Total |
104.50 |
0 |
0 |
|||||||
Service: |
Planning |
HOS/Director: |
David Davies |
|||||||
1 |
Reduce SLA Cost |
A 2% efficiency savings across the board is also appropriate for the support services |
9.5 |
PM/RS |
Planning (TPP) |
|||||
2 |
Delete Voluntary Sector Grants |
This is not a statutory requirement and therefore is one of the few potential savings areas which will not impact on the statutory duties. |
23.0 |
see below |
RS |
Planning (EDE) |
||||
3 |
Reduced staffing if VSG are deleted |
If the Grants are deleted(see above)then the staff support for administering them is not needed |
5.5 |
The value of the current staff resource in the figure shown, which could be re-invested into other environmental project work, resulting in efficiencies in work planning |
RS |
Planning (EDE) |
||||
4 |
Reduce Car Allowances |
It is proposed to put a ceiling on the mileage of essential users, resulting in better management of site visits etc. It is also in support of the Council's Green Transport Strategy. |
9.6 |
PM/RS |
Planning (TPP) |
|||||
5 |
Reduced Project and Running Expenses |
This has no direct impact on the statutory work and as such has to be considered. |
6.3 |
PM/RS |
Planning (TPP) |
|||||
Total |
53.9 |
0 |
0 |
|||||||
Note |
1. The planning service budget is significantly staff based. Efficiencies have been made over the last 3-4 years through restructuring. This has resulted in there being a deduction in third tier managers from 6 to 2. |
|||||||||
2. The funding for Western Riverside and Legible City Initiative could be relevant to the Financial Plan due to the longer term on-going costs. |
||||||||||
Service: |
Public Protection |
HOS/Director: |
Howard Nowell |
|||||||
1 |
Reduce SLA Costs |
Consistent with demand for 2% efficiencies across the board. |
1.5 |
01.04.03 |
SH |
Public Protection |
||||
2 |
Increase Land Charges Fees £2 above Inflation |
Above inflation increase for recognised service excellence unlikely to be challenged. |
12.0 |
01.04.03 |
SH |
Public Protection |
||||
3 |
Increased Fee Income Solicitor Enquiries |
Efficiency - current charges not reflecting costs. |
3.5 |
01.04.03 |
SH |
Public Protection |
||||
4 |
Delete Access Officer Post - this added back in appendix 4 now, so not proposed to be taken |
Vacant managed post - no redundancy etc. costs. |
25.5 |
01.04.03 |
Vacant post |
SH |
Public Protection |
|||
5 |
Reduce Car Allowances |
More efficient/restricted use of vehicles consistent with Council's green transport strategy. |
6.0 |
01.04.03 |
SH |
Public Protection |
||||
Total |
48.50 |
0.00 |
0.00 |
|||||||
Service: |
Support |
HOS/Director: |
Clive Thomas |
|||||||
1 |
Reduce Finance SLA Cost |
3.42 |
Support Services (TPP) |
|||||||
2 |
Reduce Personnel SLA Cost |
0.62 |
Support Services (TPP) |
|||||||
3 |
Recharge PC's to Western Riverside |
1.08 |
Support Services (TPP) |
|||||||
4 |
Recharge PC's to Training Services |
7.56 |
Support Services (TPP) |
|||||||
Total |
12.68 |
0 |
0 |
|||||||
Service: |
Waste |
HOS/Director: |
Richard Robertson |
|||||||
1 |
Reduce SLA Costs |
2% cut on SLA |
3.30 |
01/04/20003 |
N |
RS |
Waste Disposal |
|||
2 |
Reduce Car Allowances |
Reduce trips |
1.30 |
01/04/20003 |
N |
RS |
Waste Disposal |
|||
3 |
Reduce Management Fee for Waste Operations |
2% cut in service provision |
18.50 |
01/04/20003 |
Y Redundancy |
RS |
Waste Disposal |
|||
4 |
Banes Community Recycling efficiency saving (in line with council requirement) |
2% cut in service provision |
10.00 |
01/04/20003 |
Y Redundancy |
Waste Disposal |
||||
5 |
Additional Income (Trade Waste,Sales ) |
Increase in trade waste income |
30.00 |
01/04/20003 |
N |
RS |
Waste Disposal |
|||
6 |
publicity % promotions |
2% cut in service provision |
5.00 |
01/04/20003 |
N |
RS |
Waste Disposal |
|||
7 |
reduce plastics recycling at CA sites |
Remove recently introduced initiative |
6.00 |
01/04/20003 |
N |
RS |
Waste Disposal |
|||
8 |
green box replacement |
Remove ability to replace broken/stolen bins |
7.00 |
01/04/20003 |
N |
RS |
Waste Disposal |
|||
9 |
consultants |
Remove ability to replace broken/stolen bins |
3.00 |
01/04/20003 |
N |
RS |
Waste Disposal |
|||
10 |
it software |
Reduction in software support |
5.00 |
01/04/20003 |
N |
RS |
Waste Disposal |
|||
11 |
environment licences |
Fortuitous saving |
2.00 |
01/04/20003 |
N |
RS |
Waste Disposal |
|||
12 |
cease twice weekly refuse collection |
Remove initiative to collect waste from multi occupancy dwellings twice a week |
6.00 |
01/04/20003 |
N |
RS |
Waste Disposal |
|||
13 |
remove bulk bin collections |
Remove kerbside Euro bins from streets with multi occupancy dwellings |
8.00 |
01/04/20003 |
Y Redundancy |
RS |
Waste Disposal |
|||
14 |
reduce spinal road litter clearance |
Reduce frequency of litter clearance on mayor roads. |
7.00 |
01/04/20003 |
N |
RS |
Waste Disposal |
|||
15 |
remove funding for leaflets |
1.00 |
01/04/20003 |
N |
Waste Disposal |
|||||
16 |
reduce fund for replacing litter bins |
limited replacement of damaged/burnt out litter bins |
5.00 |
01/04/20003 |
N |
RS |
Waste Disposal |
|||
17 |
remove some bottle banks(cleansing implications) |
Reduction in recycling location for public |
2.00 |
01/04/20003 |
RS |
Waste Disposal |
||||
18 |
savings on parish sweeper scheme |
Rationalisation of service provision Parish/Direct Services |
0.00 |
01/04/20003 |
RS |
Waste Disposal |
||||
Total |
120.10 |
0.00 |
0.00 |
|||||||
Service: |
Econ Dev & Tourism |
HOS/Director: |
Bill Cotton |
|||||||
1 |
Reduce SLA Costs |
1.50 |
Economic Development |
|||||||
2 |
Reduce Car Allowances |
1.90 |
Economic Development |
|||||||
3 |
Develop Income streams from Street Markets |
26.00 |
Economic Development |
|||||||
Total |
29.40 |
0 |
0 |
|||||||
Service: |
Env & Consumer |
HOS/Director: |
Howard Nowell |
|||||||
1 |
Reduce SLA Costs |
Consistent with demand for 2% efficiencies across the board. |
3.00 |
01.04.03 |
SH |
Env & Consumer |
||||
2 |
Reduce Car Allowances |
More efficient/restricted use of vehicles consistent with Council's green transport policy. |
6.50 |
01.04.03 |
SH |
Env & Consumer |
||||
3 |
Increase Licensing Fees by 1% |
To achieve charging regime which reflects cost of service provision. |
2.50 |
01.04.03 |
SH |
Env & Consumer |
||||
Total |
12.00 |
0.00 |
0.00 |
|||||||
Service: |
Direct Services (Non Trading) |
HOS/Director: |
Angela Parratt |
|||||||
1 |
Reduce use of Consultant/external advisors/challengers |
Does not affect breadth of BV programme |
9.0 |
N/A |
N/A |
2003/04 |
None |
GD |
Operations Non Trading |
|
Total |
9.0 |
|||||||||
Service: |
Direct Services |
HOS/Director: |
Matthew Smith |
|||||||
1 |
Remove trader subsidy (flowers) stage 3 |
Year 3 of scheme to remove subsidy from Parks budget to support private traders to install baskets |
2.0 |
0 |
0 |
2003-4 |
NO'F |
Leisure |
||
2 |
Reduce budget for "In Bloom" entries |
Reduce support to Britain in Bloom entry. Entente Florale costs will not be incurred |
10.0 |
0 |
0 |
2003-4 |
NO'F |
Leisure |
||
3 |
Delete "survey fees" budget |
No longer required (used for mapping sites now completed) |
2.0 |
0 |
0 |
2003-4 |
NO'F |
Leisure |
||
4 |
Cessation of spring bedding in baskets etc |
Lowest impact area of floral bedding. No impact on safety |
7.0 |
0 |
0 |
2003-4 |
NO'F |
Leisure |
||
5 |
Cessation of carpet bedding (3D schemes) - added back now in options in Appendix 4 |
Most costly form of floral decoration. No impact on safety |
26.0 |
0 |
0 |
2003-4 |
NO'F |
Leisure |
||
6 |
Delete signage budget |
Non essential spending which was added in as a development item 2 years ago |
10.0 |
0 |
0 |
2003-4 |
NO'F |
Leisure |
||
Total |
57.0 |
0.0 |
0.0 |
|||||||
Service: |
Leisure Services |
HOS/Director: |
John Howey |
|||||||
1 |
Reduce support for special events |
See note |
7.5 |
Nil |
2003-4 |
NO'F |
Leisure |
|||
Total |
7.5 |
|||||||||
Service: |
Heritage Services |
HOS/Director: |
Stephen Bird / Peter Rowntree |
|||||||
1 |
Savings already programmed within the existing financial plan after the recovery plan was approved in 2002 |
|||||||||
Total |
0 |
0 |
0 |
|||||||
Service: |
Democratic/Members |
HOS/Director: |
Graham Russell |
|||||||
Note : Options up to target level of £20,000 |
||||||||||
2 |
Reduction in the committee paper budget within Democratic Services |
It should be possible to sustain a policy of paper minimisation in favour of electronic communication |
7.2 |
only when a clear council policy is in place that can support staff in being robust with members and colleagues about their paper usage. |
A robust policy will help staff to resist special pleadings |
Resources etc. |
Corporate Support Services |
|||
4 |
Cease member subsidised car parking at Guildhall and other locations |
Environmental efficiency |
20.0 |
May-03 |
Nil |
Resources etc. |
Corporate Support Services |
|||
Total |
20 |
0 |
0 |
|||||||
Service: |
Communications |
HOS/Director: |
Eric Britton |
|||||||
1 |
Reduce Ccl News |
Down from 4 to 3 issues pa |
7.0 |
Corporate Support Services |
||||||
Total |
7.0 |
0.0 |
0.0 |
|||||||
Service: |
Young People and Community Education |
HOS/Director: |
Gail Quinton/Alison Delyth |
|||||||
1 |
Reduction in grants budget including Bath Festivals Trust fee and contributions to Statement and Creative Learning Agency. |
Spread the cost evenly across all of our voluntary sector partners, minimising the impact on the services they deliver. |
12.0 |
N/A |
N/A |
4/03 - 3/04 |
None |
NO'F |
Arts |
|
Total |
12 |
0 |
0 |
|||||||
HOS/Director: |
Louise Tester |
|||||||||
Note: Options for providing the required savings of up to: £7,000 |
||||||||||
1 |
Cut web development budget by half |
Work could be done by IDS / e-government |
7 |
0 |
0 |
Less need for existing staff resource |
E-government, BV and customer Satisfaction |
Corporate Projects |
||
2 |
Cut community strategy budget |
Deliver the strategy based on what is already there, and limit customer consultation and community engagement on the basis that we have asked them previously |
7 |
0 |
0 |
Less need for Corporate Projects Resource |
Leader |
Corporate Projects |
||
Total |
7 |
0 |
0 |
|||||||
Service: |
HUMAN RESOURCES |
HOS/Director: |
William Harding/Sarah Berry |
|||||||
Options for savings up to level of £14,000 |
||||||||||
1 |
Reduce grant to Staff Social Club & explore with committee alternative sources of support |
Grant has remained at 1996 level with only one earlier reduction in funding (£3,000) in 2001/2 |
3.0 |
0 |
0 |
Apr-03 |
0 |
RT |
Corporate Support Services |
|
2 |
Reduce Corporate Training Budget |
Rely solely upon funding allocation within financial plan 2003/04 |
6.0 |
0 |
0 |
Apr-03 |
0 |
RT |
Corporate Support Services |
|
3 |
Renegotiate Corporate Trade Union Facilities Budget |
Shared allocation of savings in order to produce required financial efficiency |
5.0 |
Apr-03* |
0 |
RT |
Corporate Support Services |
|||
4 |
Reduce staff support costs across service |
To produce required savings limited options available |
14.0 |
0 |
0 |
Apr-03 |
0 |
RT |
Corporate Support Services |
|
Total |
14 |
|||||||||
Service: |
Libraries & Information |
HOS/Director: |
Sarah Berry |
|||||||
1 |
Self issue terminals in Bath Central |
Exploits technology to improve customer service. Frees up staff time. |
15.0 |
-70 |
-8 |
2003/4 |
FTE - reduction by 2 library assistants |
GD / No'F |
Libraries & Information |
|
2 |
Strategic stock buying within Foursite Consortium |
Reduces overall spend on stock, because would buy within a four authority consortium. Specialist books therefore available within the consortium even if not available locally. |
24.0 |
2003/4 |
reduce 1 FTE stock post but would need to part fund a stock manager in Foursite |
GD / No'F |
Libraries & Information |
|||
Total |
39 |
-70 |
-8 |
|||||||
CAP - customer access programme |
||||||||||
BVR - best value review |
||||||||||
GD - Gitte dawson |
||||||||||
NO'F - Nicole O'Flaherty |
||||||||||
Service: |
Youth |
HOS/Director: |
Alison Delyth |
|||||||
1 |
Cease concession to Bath Asian Council for lease |
Organisation has folded and is no longer occupying its offices in Westgate Street |
6.5 |
0 |
0 |
Apr-03 |
none |
GC |
Youth & Community |
|
2 |
Reduce part time youth club workers posts to multiples of 3.5 hours from 3.7 hours |
Youth workers do 3 hours per evening and use the additional 0.7 hours for other work. These are not always used efficiently. |
3.0 |
0 |
0 |
Apr-03 |
none |
GC |
Youth & Community |
|
3 |
Reduction in various cash budgets |
Less funding would be available for developmental work |
5.5 |
0 |
0 |
Apr-03 |
none |
GC |
Youth & Community |
|
4 |
Reduce funding available from revenue budget |
Volunteer organisations would need to find other ways of meeting the shortfall. Potential for organisations closing or making staff redundant. |
10 |
0 |
0 |
Apr-03 |
May impact on staffing levels of outside organisations |
GC |
Youth & Community |
|
Total |
25 |
0.0 |
0.0 |
Appendix 5
BASE BUDGET 2003/04 |
APPENDIX 5 |
||||||||||||
EXECUTIVE PORTFOLIO |
Service |
Opening Base Budget 2003/04 per Budget Setting Plan |
Rephased Financial Plan Items |
2% Proposals (Excluding Soc Services) (App 4) |
1% Re investment (Excluding Soc Services) |
Inflation Provision (to be allocated) |
Proposed Financial Plan Items (see background paper for list) |
Appendix 1 changes to Allocations |
Appendix 2 & 3 and new SS Money |
2003/04 Proposed Budget |
NOTE only: Additional funding/ saving (-) in proposals over base plan (App 1,2,3) * |
||
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
|||||
£'000 |
£'000 |
£'000 |
£'000 |
£'000 |
£'000 |
£'000 |
£'000 |
£'000 |
|||||
Transportation and Planning Policy (Councillor Peter Metcalfe) |
Support Services |
697 |
(13) |
292 |
(292) |
684 |
(292) |
||||||
Planning Services |
1,986 |
(19) |
(115) |
100 |
1,952 |
100 |
|||||||
Highways & Transportation |
5,487 |
(137) |
(50) |
494 |
5,794 |
494 |
|||||||
Access Management |
2,432 |
(45) |
(257) |
(173) |
50 |
2,007 |
(123) |
||||||
Car Parking (excluding Park & Ride) |
(3,805) |
(105) |
(169) |
(4,079) |
|||||||||
Park & Ride |
(256) |
(256) |
|||||||||||
Corporate Transport Savings |
(40) |
(40) |
|||||||||||
SUB TOTAL |
6,502 |
(45) |
(273) |
292 |
(591) |
(73) |
252 |
6,063 |
|||||
Education (Councillor Gerry Curran) |
Education |
68,484 |
2,800 |
6,099 |
77,382 |
||||||||
Youth & Community |
1,240 |
(25) |
12 |
1,227 |
|||||||||
SUB TOTAL |
69,724 |
(25) |
12 |
2,800 |
6,099 |
78,609 |
|||||||
Social Services (Councillor Jane Tapper) |
Adult Services |
22,240 |
(93) |
To follow |
|||||||||
Children's Services |
6,634 |
To follow |
|||||||||||
Other Services |
2,279 |
To follow |
|||||||||||
SUB TOTAL |
31,153 |
(93) |
1,136 |
2,260 |
55 |
220 |
34,730 |
||||||
Customer Satisfaction, Best Value & E-Government (Councillor Gitte Dawson) |
Corporate Projects |
567 |
(7) |
175 |
(53) |
(9) |
673 |
(62) |
|||||
Property Services |
822 |
(17) |
(86) |
719 |
(86) |
||||||||
Repairs & Maintenance |
2,667 |
(53) |
300 |
2,914 |
|||||||||
Commercial and Corporate Estate |
(6,849) |
(30) |
461 |
(6,419) |
461 |
||||||||
Best Value & Procurement |
540 |
(9) |
5 |
(10) |
526 |
||||||||
SUB TOTAL |
(2,252) |
(86) |
5 |
435 |
408 |
(95) |
(1,586) |
||||||
Economic Development & Environment (Councillor Roger Symonds) |
Planning Services |
821 |
(35) |
(5) |
781 |
||||||||
Cleansing |
3,623 |
(101) |
3,522 |
(101) |
|||||||||
Waste Disposal |
4,625 |
(75) |
(120) |
158 |
85 |
4,672 |
85 |
||||||
Economic Development |
1,162 |
(29) |
(5) |
1,127 |
|||||||||
SUB TOTAL |
10,230 |
(75) |
(184) |
147 |
85 |
(101) |
10,103 |
||||||
Resource Planning & Support Services (Councillor Rosemary Todd) |
Corporate Support Services |
3,477 |
(41) |
60 |
180 |
(5) |
3,671 |
175 |
|||||
Resources Director & Business Services |
873 |
(20) |
74 |
(94) |
833 |
(94) |
|||||||
Emergency Management Unit |
75 |
35 |
110 |
35 |
|||||||||
Strategic Resource Planning |
1,095 |
(1) |
(25) |
1,069 |
(25) |
||||||||
Revenues & Benefits |
1,236 |
(26) |
(60) |
(186) |
70 |
1,034 |
(116) |
||||||
Information & Development Services |
139 |
(12) |
130 |
29 |
286 |
29 |
|||||||
PARIS Project |
500 |
(500) |
|||||||||||
Legal Services |
(11) |
(11) |
|||||||||||
Operations Non Trading |
408 |
(245) |
105 |
(45) |
223 |
60 |
|||||||
Operations Trading |
(666) |
(20) |
(15) |
(701) |
(15) |
||||||||
Loan Charges & Contribution to/from HRA |
3,197 |
(308) |
2,889 |
||||||||||
Interest on Balances |
(789) |
(21) |
975 |
166 |
|||||||||
Unfunded Pensions |
1,654 |
(44) |
1,610 |
||||||||||
Council Tax Benefits & Housing Benefits |
1,766 |
(150) |
1,616 |
(150) |
|||||||||
Other Miscellaneous Budgets |
3,299 |
(2,340) |
(350) |
609 |
(350) |
||||||||
SUB TOTAL |
16,251 |
(119) |
74 |
(2,353) |
(372) |
(79) |
13,402 |
||||||
Tourism, Leisure & Culture (Councillor Nicole O'Flaherty) |
Libraries & Information |
1,966 |
(39) |
90 |
2,017 |
90 |
|||||||
Arts |
578 |
(12) |
6 |
572 |
|||||||||
Tourism |
368 |
(56) |
20 |
332 |
20 |
||||||||
Heritage including Archives |
(2,826) |
(378) |
(30) |
(3,234) |
(30) |
||||||||
Leisure |
3,330 |
(65) |
32 |
(370) |
105 |
3 |
3,035 |
108 |
|||||
SUB TOTAL |
3,415 |
(116) |
38 |
(804) |
195 |
(7) |
2,722 |
||||||
Community Safety, Housing and Consumer Services (Councillor Steve Hedges) |
Environmental & Consumer Services |
1,743 |
(12) |
17 |
13 |
(30) |
1,731 |
(17) |
|||||
Housing |
1,964 |
(35) |
17 |
75 |
2,021 |
75 |
|||||||
Drug Action Team & Community Safety |
608 |
608 |
|||||||||||
Youth Offending Team |
167 |
167 |
|||||||||||
Public Protection |
104 |
(49) |
26 |
(48) |
33 |
(23) |
|||||||
Stone Mines |
53 |
53 |
|||||||||||
Fire Service |
6,250 |
600 |
6,850 |
||||||||||
Magistrates |
232 |
232 |
|||||||||||
Coroners |
147 |
147 |
|||||||||||
Environment Agency |
633 |
10 |
643 |
||||||||||
SUB TOTAL |
11,901 |
(96) |
17 |
610 |
17 |
114 |
(78) |
12,485 |
|||||
Revised Base Pressures to be allocated |
|||||||||||||
Adjustments per Appendix 1 |
2,253 |
(2,253) |
(2,253) |
||||||||||
Adjustments per Appendix 2 |
|||||||||||||
Adjustments per Appendix 3 |
|||||||||||||
Social Services New Money |
|||||||||||||
Savings to be identified |
(29) |
(29) |
(29) |
||||||||||
Extra Revenue to 6% Council Tax |
250 |
250 |
250 |
||||||||||
Inflation Provision to be allocated |
1,928 |
115 |
2,042 |
115 |
|||||||||
TOTAL |
146,923.892 |
(213.0) |
(898.4) |
437.5 |
6,473.9 |
7,461.2 |
(1,727.0) |
334.0 |
158,792.128 |
(1,668) |
|||
* Shows shift in spending as a product of reduction to pressures and changes to Appendix 1, plus extra savings above 2% in appendix 2 plus investment and compensating savings in appendix 3 |
App 6 - Corporate Budgets
Item in Corporate Budgets |
2002/03 £'000 |
2003/04 £'000 |
Variation £'000 |
Total Variation |
Portfolio |
Comment |
Loan Charges, Interest on balances and HRA Contribution |
||||||
Loan Charges |
3,047 |
2,964 |
-83 |
Reduced Avon residual cost £159k and increased own cost of debt £75k - see appendix 1 |
||
Interest on balances |
-789 |
91 |
880 |
See appendix 1 |
||
HRA Contribution |
150 |
0 |
-150 |
No longer required. |
||
Sub Total |
2,408 |
3,055 |
647 |
647 |
RT |
Reduction in contribution to residual Avon debt offset by increased costs of borrowing as cash reserves fall. |
Unfunded Pensions |
1,654 |
1,610 |
-44 |
-44 |
RT |
Small reduction in contributions built into revised base plan |
Coroners |
147 |
147 |
0 |
0 |
SH |
Nearly 8% increase in charge built into inflation allocation |
Rent Allowances & Council Tax/Hsg Benefit Subsidy |
Changes in funding - have moved to direct grant funding |
|||||
Council tax rebates expenditure |
5,350 |
5,350 |
0 |
|||
Council tax rebates income |
-5,040 |
-5,040 |
0 |
|||
Sub Total |
310 |
310 |
0 |
RT |
||
Housing Benefit Rent allowances expenditure |
25,537 |
22,537 |
-3,000 |
|||
Housing Benefit Rent allowances income |
-24,081 |
-21,231 |
2,850 |
|||
Sub Total |
1,456 |
1,306 |
-150 |
-150 |
RT |
Supporting people benefits drop out effect - now directly grant funded - see appendix 1 |
Other Miscellaneous Budgets |
||||||
External Audit Fees |
213 |
313 |
100 |
Appendix 1 pressure |
||
Bank & Treasury Mgt Charges |
88 |
88 |
0 |
|||
Corporate Overheads |
-520 |
-520 |
0 |
|||
Pay Provision |
50 |
90 |
40 |
Virement to be reported in March to allocate to service budgets in 02/03, ongoing effect in inflation provision |
||
Discretionary Rate Relief |
110 |
110 |
0 |
|||
Insurance Premia increase provision |
102 |
102 |
0 |
May be a reduction that can be taken in inflation provision made for 03/04. But there is a large increase in public liability in 2003/04 on 2002/03. |
||
Provision for 2001/02 overspend |
1,550 |
0 |
-1,550 |
2002/03 only |
||
Replenish Balances |
900 |
450 |
-450 |
£200k reduction was in base plan. |
||
Shift from revenue financing of capital |
0 |
-200 |
-200 |
See Appendix 1 |
||
Jubilee & Extra Bank Holiday Costs |
100 |
0 |
-100 |
2002/03 only |
||
Parish Warden Scheme |
7 |
7 |
0 |
|||
Planning case legal costs |
500 |
0 |
-500 |
2002/03 only |
||
Student Liaison Committee |
14 |
14 |
0 |
|||
Other Misc. Items - Plan Increase Corp 36 |
0 |
10 |
10 |
Existing plan item |
||
Corporate Grants to Voluntary Bodies |
168 |
168 |
0 |
|||
Joint Archive Arrangements |
17 |
17 |
0 |
|||
Sub Total |
3,299 |
649 |
-2,650 |
-2,650 |
RT |
|
Repairs and Maintenance |
2,667 |
2,914 |
247 |
247 |
GD |
2% efficiency (appendix 3) saving (£53k) and £300k corporate estate maintenance switch from capital to revenue funding (RCC9 in existing plan). |
Commercial & Corporate Estate |
-6,849 |
-6,369 |
480 |
480 |
GD |
Increased costs of office accommodation in Trimbridge House and non-achievement of the Guildhall and long-term Office Accommodation savings. |
Agency Budgets |
||||||
Fire |
6,250 |
6,850 |
600 |
SH |
Assumed at 9.1% in inflation provision |
|
Environment Agency |
633 |
643 |
10 |
SH |
Assumed slightly above inflation |
|
Magistrates |
232 |
232 |
0 |
SH |
Assumed at inflation |
|
Sub Total |
7,115 |
7,725 |
610 |
610 |
SH |
|
Total Budgets |
12,207 |
11,347 |
-861 |
-861 |
||
All these budgets are subject to final inflation allocations within the total provision. This is with the exception of agency budgets, where inflation has been included. |
||||||
Appendix 7 - Capital
Other
Other
Other
Total
2003/04 DRAFT CAPITAL PROGRAMME |
|||||||||||
1. Existing Programmes |
Financial Plan - Jan Exec |
Changes now Proposed |
Revised Programmes |
Comment on Proposed Change |
|||||||
ACG/SCA/Grant |
Other |
ACG/SCA/Grant |
Other |
ACG/SCA/Grant |
Other |
Total |
|||||
EDUCATION |
|||||||||||
Base programme (ACG) |
1,400,000 |
-101,000 |
1,299,000 |
0 |
1,299,000 |
Figures brought into line with DfES allocations |
|||||
Access Initiative (ACG) |
250,000 |
43,000 |
293,000 |
0 |
293,000 |
||||||
NDS Modernisation (SCA) |
0 |
760,000 |
760,000 |
0 |
760,000 |
||||||
NDS Condition & Devolved (Grant) |
0 |
3,409,000 |
3,409,000 |
0 |
3,409,000 |
||||||
Radstock schools (SCA) |
3,524,000 |
3,524,000 |
0 |
3,524,000 |
|||||||
5,174,000 |
0 |
4,111,000 |
0 |
9,285,000 |
0 |
9,285,000 |
|||||
SOCIAL SERVICES |
|||||||||||
Base programme (ACG) |
100,000 |
19,000 |
119,000 |
0 |
119,000 |
DoH allocation |
|||||
EPH's (FP) |
2,000,000 |
0 |
2,000,000 |
2,000,000 |
|||||||
CRISSP (FP) |
276,000 |
0 |
276,000 |
276,000 |
|||||||
100,000 |
2,276,000 |
19,000 |
0 |
119,000 |
2,276,000 |
2,395,000 |
|||||
PT&E |
|||||||||||
LTP programme (ACG) |
7,400,000 |
-62,000 |
7,338,000 |
0 |
7,338,000 |
GOSW allocation |
|||||
Increased repairs to carriageways (FP) |
250,000 |
0 |
250,000 |
250,000 |
|||||||
7,400,000 |
250,000 |
-62,000 |
0 |
7,338,000 |
250,000 |
7,588,000 |
|||||
PROPERTY |
|||||||||||
Base Programme (FP) |
1,000,000 |
0 |
1,000,000 |
1,000,000 |
|||||||
Increased planned maintenance (FP) |
500,000 |
0 |
500,000 |
500,000 |
|||||||
Risk assessment/disabled access (FP) |
375,000 |
-200,000 |
0 |
175,000 |
175,000 |
In line with recommended revenue budget |
|||||
Commercial estate development (FP) |
200,000 |
0 |
200,000 |
200,000 |
|||||||
Long term office approach (FP) |
100,000 |
0 |
100,000 |
100,000 |
|||||||
0 |
2,175,000 |
0 |
-200,000 |
0 |
1,975,000 |
1,975,000 |
|||||
RESOURCES |
|||||||||||
IT servers & networks (FP) |
200,000 |
0 |
200,000 |
200,000 |
|||||||
FMS replacement (FP) |
51,000 |
0 |
51,000 |
51,000 |
|||||||
0 |
251,000 |
0 |
0 |
0 |
251,000 |
251,000 |
|||||
CCL |
|||||||||||
Heritage Invest to sustain (FP) |
150,000 |
0 |
150,000 |
150,000 |
|||||||
0 |
150,000 |
0 |
0 |
0 |
150,000 |
150,000 |
|||||
CORPORATE |
|||||||||||
Western Riverside (FP) |
1,608,000 |
-758,000 |
0 |
850,000 |
850,000 |
||||||
Spa scheme (FP) |
1,125,000 |
0 |
1,125,000 |
1,125,000 |
FP allocation includes replenishment of risk management reserve |
||||||
Stone Mines (FP) |
100,000 |
0 |
100,000 |
100,000 |
|||||||
NRR Regeneration Company (FP) |
175,000 |
-20,000 |
0 |
155,000 |
155,000 |
Latest forecast |
|||||
Public Service Agreements (FP) |
500,000 |
0 |
500,000 |
500,000 |
|||||||
Customer Services access (FP) |
50,000 |
200,000 |
200,000 |
50,000 |
250,000 |
IEG allocation |
|||||
Unallocated base programme (FP) |
250,000 |
0 |
250,000 |
250,000 |
|||||||
Unallocated for Pressures (FP) |
1,422,000 |
543,000 |
0 |
1,965,000 |
1,965,000 |
||||||
Unallocated budget for in-year approvals (BCA) |
250,000 |
250,000 |
0 |
250,000 |
|||||||
250,000 |
5,230,000 |
200,000 |
-235,000 |
450,000 |
4,995,000 |
5,445,000 |
|||||
HOUSING |
|||||||||||
Renovation & Disabled Facilities Grants |
900,000 |
900,000 |
0 |
900,000 |
|||||||
Social Housing Grant |
3,000,000 |
0 |
3,000,000 |
3,000,000 |
|||||||
900,000 |
3,000,000 |
0 |
0 |
900,000 |
3,000,000 |
3,900,000 |
|||||
Total |
13,824,000 |
13,332,000 |
4,268,000 |
-435,000 |
18,092,000 |
12,897,000 |
30,989,000 |
||||
Grand Totals |
27,156,000 |
3,833,000 |
30,989,000 |
||||||||
Financed by: |
|||||||||||
Credit Approvals |
14,011,000 |
659,000 |
14,670,000 |
||||||||
Grant |
354,000 |
3,609,000 |
3,963,000 |
||||||||
Internal Cash (receipts + PCL) |
12,291,000 |
-395,000 |
11,896,000 |
||||||||
Vehicle Replacement Reserve |
0 |
160,000 |
160,000 |
Use of surplus funding within reserve |
|||||||
Revenue |
500,000 |
-200,000 |
300,000 |
||||||||
Total |
27,156,000 |
3,833,000 |
30,989,000 |
||||||||
2. Proposed Allocations of Unallocated for Pressures |
|||||||||||
Education - school improvements programme |
600,000 |
||||||||||
Pulteney Weir remedial works |
450,000 |
Report to Exec being prepared |
|||||||||
Contingency for major projects |
100,000 |
To be allocated by Executive as required |
|||||||||
Revenues & Benefits IT system upgrade |
175,000 |
||||||||||
Emergency Management Unit radio receivers |
5,000 |
||||||||||
Linear Way |
40,000 |
||||||||||
Leisure pressures |
80,000 |
Mainly parks and cemeteries |
|||||||||
Schemes to lever external funds |
All subject to external funds being secured |
||||||||||
Environment Park |
75,000 |
£87,000 received |
|||||||||
Arts Workshop |
8,000 |
levers £80,000 (offered) |
|||||||||
Victoria Art Gallery access |
56,000 |
levers £600,000 (bid) |
|||||||||
"Invest to Save" |
|||||||||||
Geographic Information System |
150,000 |
All subject to production and approval of business cases |
|||||||||
Secondary Schools' cafeteria improvements |
100,000 |
||||||||||
Land Registration |
60,000 |
||||||||||
Cemeteries and Crematoria |
66,000 |
||||||||||
Total Proposed Allocations |
1,965,000 |