Report to Executive
4-Monthly Performance Report
Date |
14th January 2004 |
Reporting Area |
Council Performance |
Lead Director |
Peter Rowntree |
SCOPE OF REPORTING AREA
Bi-annual progress report on all the targets contained in the Council's Performance Plan
208 Performance Targets
Of which 42 are "key indicators
30 Commitments
30 PSA Targets
1. Progress / Issue Reporting |
Progress Made |
Issues to be addressed |
Who |
By When |
|
Leadership Updates on previous report |
· The draft Corporate Plan framework has been approved by Council, setting out the improvement priorities over the period to March 2006. More details will added to the draft following the latest round of service planning and budget setting |
· Achieving Corporate Plan priorities depends on the ability of the organisation to shift resources to support these priorities · Action Plans detailing how these priorities will be implemented are required together with a set of Key Targets |
ALL ALL |
Feb 2004 Mar 2004 |
· This Report shows that the Council is likely to achieve a similar number of targets as last year - in the region of 60% |
· Targets reported as Amber and Red require actions as stated to meet the agreed targets |
ALL |
Mar 2004 |
|
· The Comprehensive Performance Assessment (CPA) score is updated in Dec 2003. · Social Services have maintained their 2 star rating after a new Social Services Inspectorate (SSI) update · Education also remains a `two star' service but in the upper part of that band. The Council has gained from the fact that there are now no schools in special measures |
· No change in our overall "Good" rating, although some detailed service score adjustments · Internal Audit are to inspect the systems behind those indicators identified as `High Risk' |
ALL RES |
March 2004 March 2004 |
|
· The Improvement Programme agreed with our external inspectors, following the 2002 CPA assessment, is progressing on schedule |
· A "round table" meeting is planned for April 2004 to review our new priorities with our external regulators |
ALL |
April 2004 |
|
· The Executive decided to open a new Bath Special School, following successful bid to Department for Education & Skills (DfES) |
· These schools need to meet changing profile of special needs over the next five years |
EDU |
Jan 2004 |
|
Leadership New items |
· Review of Keynsham school provision has begun with clear analysis of local data, contributor session arranged. Other local reviews will follow in succeeding terms |
· Council and local schools need to agree future progress which parents support |
EDU |
Jan 2004 |
· Government has published Green Paper on Children's Services which could mean restructuring of Education and Social Services. · A positive evaluation from the Social Services Inspectorate regarding recommendations of the Climbie Inquiry. The Council is deemed to be "serving most children well, with promising capacity for improvements". Action plan targets due for completion in July have all been met |
· Practicable way forward being discussed · Ensure future targets are achieved |
HSS/ EDU HSS |
Jan 2004 Mar 2004 |
|
· Local Government Pay - Report of national commission on local government pay awaited |
· Recommendations will need to be evaluated in terms of affordability and impact on budgets and Council priorities |
CORP |
Mar 2004 |
|
People Updates on previous report |
· Human Resources (HR) Strategy published as part of corporate Improvement Programme |
· Strategy & Action Plan approved at December Executive for implementation |
CORP |
Ongoing |
· Radical proposals for Development Control structure issued for consultation |
· Structure to meet challenges of new planning system and issues raised through Best Value Review |
EED |
Mar 2004 |
|
· A Social & Housing Services Workforce Development Group has been established |
· Agree the priorities for action to ensure an adequate supply of suitable skilled and trained staff to meet the future requirements of the service |
HSS |
Ongoing |
|
People New items |
· Performance review process review underway in light of staff survey feedback & issues identified as part of development of HR Strategy · Change Management training and Coaches in place |
· Recommended changes will need to be well publicised with appropriate support for 2004 process · To be fully effective, change management initiatives across the Council will need to be adequately resourced (including staff development) |
CORP ALL |
Feb 2004 Ongoing |
· Recruitment Review. Successful pilot fair held and cross-service event planned for Autumn 2003 |
· Development of micro-jobs web site and related e-recruitment activity planning underway |
CORP |
Jan 2004 |
|
· Transport Access & Waste Management reorganised to provide a clear approach to managing the new partnership arrangement and to translate a business ethos across the whole service area - Removal of Engineering Consultancy - Creation of Partnership Manager and Design Group |
· Implementation of the Action Plan arising from the Best Value Review · Integration of the new partnership arrangements |
EED |
Mar 2004 |
|
· Formal consultation on the improvement of homecare services has been completed |
· Recommendations for changes to the service considered by the Executive Member in December |
HSS |
Dec 2003 |
|
· Library and Customer Services being merged via a staff restructure |
· To achieve a more customer focused service; better address challenges to the service |
CORP |
Complete |
|
· Homeworking - initial result is an increase in productivity and next group of staff for pilot have been selected |
· Cost and efficiency benefits will be reported periodically as pilot progresses |
RES |
Ongoing |
|
· Restructuring of The Education's Children's and Young People's Service to focus more on inclusion issues |
· Successful implementation of new structure |
EDU |
March 2004 |
|
Partnership & Resources Updates on previous report |
· Current budget position shows projected overspend |
· Recovery plans have been developed to reduce the year end deficit and need to be monitored and managed |
ALL |
Mar 2004 |
· Overspend on the Council's Elderly Persons Homes budget caused by increased staffing levels to meet the new National Care Standards and agency staff costs to cover vacancies and sickness |
· Stringent efforts are required to control and reduce this overspend further |
HSS |
Mar 2004 |
|
· `Passporting' of money to schools will this year take the form of a per pupil guarantee |
· Meeting Government requirements for schools' funding and the requirements of the Corporate Plan |
EDU |
Mar 2004 |
|
· The Business Improvement Partnership is now in transition phase establishing key mechanisms for delivery of service improvements, other working groups, and the Business Improvement Service (BIS) |
· Consolidation of ICT service delivery · Marketing and communication of role of Business Improvement Service. · Delivery of new People service including new payroll upgrade · Scanning in Planning identified as high priority |
RES |
April 2004 |
|
· Bath Community Partnership Delivery Plan agreed by Regional Development Agency and Council |
· Ensuring projects are developed & delivered |
EED |
Mar 2004 |
|
· Rural renaissance bid being prepared on behalf of sub region |
· Ensure cross-Council support |
EED |
Apr 2004 |
|
· Environment Park - External Advice on procurement contract documentation and strategic partner agreement - contracts placed with specialist consultants |
· Ensure key milestones are met |
EED |
Mar 2004 |
|
· Tourism Company near completion |
· Service Level Agreement to be finalised |
EED |
Jan 2004 |
|
· Roman Baths is a partner in £100,000 Campaign for Learning project - 'Foyers' |
· Engage hard-to-reach audience |
OPS |
Mar 2006 |
|
· Leisure Partnership: transfer of property risk and improved development proposals negotiated while still delivering target savings on running costs · Over 4% increase in Sports & Leisure Centre visits and 10% increase in income due to improved facilities and new promotions. Over £40,000 per month now collected through direct debit |
· Higher than budgeted costs in early years offset by savings in later years of contract · Top 25% performance requires more visits - performance improvement now built into Partnership contract |
OPS OPS |
End of contract End of contract |
|
Partnership & Resources New items |
· Procurement Project - being developed with HBS and Buying Team with prospect of real savings · Payroll and HR Admin staff transferred to HBS to create
People Service · Telephones improvement strategy presentation made to Customer Access Programme staff and Heads of Service |
· Link to the National Procurement Strategy and will require Business Process Re-engineering within services · Successful establishment of People Service in single location with implementation of `Peoplelink' · Reconfiguration of Retained HR Service to deliver HR Strategy and other Council priorities · Business Improvement Service (BIS) to produce Business Case and Project Plan to gain approval and funding to progress with project |
RES/ OPS CORP |
Ongoing Ongoing |
· Interim Pensions valuation - increase in employers contribution inevitable from 2005 |
· Substantial financial pressure -will be incorporated in financial plan process |
RES |
Feb 2004 |
|
· Regular meetings, chaired by a representative of the Royal United Hospital (RUH), are now being held with B&NES Primary Care Trust (PCT), Wiltshire social services, Wiltshire PCT and B&NES Social Services to negotiate the plans for delayed discharge fines. A `dry run' to implement cross charging began at the start of October 2003 |
· Finalising of agreement and protocols with the PCT and RUH as to how any fine incurred will be treated |
HSS |
Mar 2004 |
|
· Proposals have been discussed for the re-structuring of the Community Safety and Drug Action Team Partnerships in line with government direction |
· New structures to be agreed and implemented by the Partnerships |
HSS |
Apr 2004 |
|
B7 Partnership Review under way in response to DA issues and CPA issues |
· Rationalisation of Council participation in partnerships to focus on delivery of Corporate Plan and Community Strategy |
All |
||
Policy and Strategy Updates on previous report |
· The Local Plan now agreed by Council for 2nd Deposit consultation. · Advice received to indicate that it is essential to progress Local Plan to Inquiry |
· This will help achieve robustness of planning decisions · Important for public perception of plan process and to properly test key policies |
EED |
May 2004 |
· Accommodation Strategy - Development of the strategy ongoing with completion of next phase report due by Feb 2004 |
· Need to progress rationalisation as short and medium term plan |
RES |
Ongoing |
|
· Corporate Governance - eg Risk strategy, freedom of information, IT security and Data Protection - being strengthened |
· Risk management strategy will be integrated into the planning processes, together with our response to the Freedom of Information Act. Proposals have been made to achieve compliance with ISO 17799 Standard |
RES |
Mar 2004 |
|
· The Local Transport Plan is to be aligned with the Community Strategy and will be considered in the consultation on the Corporate Plan |
· Ensure that Transportation is adequately represented in key planning strategies and recognised as a priority area |
EED |
Mar 2004 |
|
· Control of Open Top Tour Buses; approach agreed using Traffic Regulation Conditions (TRC) |
· Technical advice being sought about the implementation of TRC |
EED |
Jan 2004 |
|
· The first Public Service Agreement (PSA) monitoring report has been produced setting out the interim targets between now and 2006 |
· On-going support to staff involved in the Project is required to ensure that the Council benefits from as much of the performance award as possible |
ALL |
Mar 2006 |
|
· Implementation of Early Years Plan, particularly planning agreement for Keynsham Neighbourhood Nursery |
· Keynsham Neighbourhood Nursery built in timescale set |
EDU |
April 2004 |
|
· We are a first phase council for new, Single Education Plan, agreed between DfES and councils. 93Compact94 is the beginning of this process, replacing other statutory plans |
· Helps us become more strategic, but will require more than simply having one big plan |
EDU |
April 2005 |
|
· Licensing Act - major changes to alcohol and entertainment licensing |
· Licensing Forum leading to establishment of Licensing Policy |
EED |
Jan 2004 |
|
· A revised draft of the Community Strategy has been approved by the LSP and subsequently by Council |
· Establishment of Key Partnerships for Transport and for Culture · Establishing effective performance management system |
CORP |
Apr 2004 |
|
Policy and Strategy New items |
· A workshop for staff and portfolio holders held to confirm priorities for the 2002-2011 Housing Strategy · A workshop on the Affordable Housing Strategy was held for senior staff and relevant portfolio holders in October · The housing strategy for the Drug Action Team has been published · A rural housing strategy has been drafted in partnership with North Somerset and South Gloucestershire. The strategy is intended to support a bid to the Housing Group for funding for a 3 year programme of investment in rural housing and a rural enabling officer (REO) post |
· The reviewed and updated Strategy is due for submission to GOSW by February 2004 · The draft strategy is to go out to consultation, it is proposed that the Overview & Scrutiny panel drive this consultation process · Work with Somer Community Housing on developing their 93drugs policy94 · The role & objectives of the REO are the subject of negotiation between the three local authority partners and the voluntary organisation managing the REO. The Rural Housing Strategy cannot be finalised until agreement has been reached on this issue |
HSS HSS |
Jan 2004 Apr 2004 |
· The first review of a Supporting People funded service has been completed |
B7 Reflection on the first review has highlighted areas for improvement |
HSS |
Jan 2004 |
|
· The review of the pilot for the Homeseekers Register is underway and due to report in December |
· The review will consider how to lessen the impact of the pilot on the length of stay in bed & breakfast |
HSS |
Jan 2004 |
|
Processes Updates on previous report |
· Revenues and Benefits Service backlogs - HBS are assisting. Call distribution system has gone live with significant improvement in telephone response times. · Recent Benefit Fraud Inspectorate Inspection recognised improvement |
· Must continue to tackle backlog and improve performance indicators in the current financial year, although it is expected that these will not be achieved until the year-end |
RES |
Mar 2004 |
· Decriminalised Parking now operational. Targets established and weekly joint service operational meetings to review performance · Performance management framework introduced, together with various operational initiatives which are improving efficiency · Business Plan Financial targets over ambitious |
· Implement Recovery Plan · Review Parking Attendant levels - to cope with problems with sickness and leave |
EED |
Aug 2004 |
|
· The number of reports dealt with by the community wardens has risen steadily; they are currently resolving 87% of issues referred to them immediately |
· A monitoring report has been prepared for the first five full months of operation of the Community Warden scheme. Issues arising will be addressed |
HSS/ OPS |
Jan 2004 |
|
· An Occupational Therapist has been seconded to undertake medical assessments of housing applicants, to speed up homelessness decision making · A B&B task group has been established to reduce the usage of B&B accommodation for homeless people |
· Careful monitoring of speed of decision making to assess the impact of this initiative |
HSS |
Mar 2004 |
|
· New Planning delegation scheme implemented to achieve government targets · Development Control Charter now approved. Audit of Development Control Process carried out by Internal Audit and actions agreed |
· This is important to help improve performance, and reduce the workload of committees · We need to deal with our performance in major applications within 13 weeks · Probity, transparency and perception of democratic process by the public |
EED |
Mar 2004 |
|
· Impacts of e-government and customer access reviewed with Heads of Service |
· Translate common themes into strategic projects |
CORP |
Jan 2004 |
|
· Learning Skills Council has agreed to fund both a data officer for the Council and a value-added system in every secondary school to measure progress between GCSE and `A' level |
· Using value-added information to identify weaknesses in progress and forming action plans to address this |
EDU |
Mar 2004 |
|
Processes New items |
· The Education `Service Improvement Group' has been reviewed to improve the quality process for both schools and services with weaknesses |
· Dealing with all current issues in a reasonable time scale |
EDU |
Sept 2004 |
· Parking security - Car crime is increasing |
· Parking staff are working with the police to resolve |
OPS/ EED |
Mar 2004 |
|
· Data on bus journeys made has been adjusted following new information from bus companies. Additional 125,000 passengers by 2006 remains the target |
· Seeking legal advice on potential to operate Council vehicles on public service routes in line with PSA |
EED |
2004 |
|
· A positive report has been received following the Inspection of Fostering Services by National Care Standards Commission (NCSC) in April 2003 |
· Respond to and implement action plan arising from inspection report |
HSS |
Mar 2004 |
|
· PARH: the Partnership Against Racial Harassment established as a subgroup of the Community Safety Partnership to reduce the level of racial harassment and increase support to victims. |
· Identify a range of other places including council offices and community venues where people can report incidents which will then be passed on to SARI, the victim support agency |
HSS |
Jan 2004 |
|
· New Emergency Planning Bill - Dissemination of information supplied prior to the introduction of new legislation in late 2003 |
· New responsibilities and functions are to be placed on the Council to perform a wider range of Emergency Planning duties |
RES |
April 2004 |
|
· Regular review of impact of media coverage on reputation of Council |
· Effective forward planning of work with major public impact to achieve improved reputation management |
ALL |
ongoing |
Glossary - Directors - OPS = Operations, HSS = Housing & Social Services, EED = Economic & Environment Director, CORP = Corporate Director, Res = Resources, EDU = Education
2. Reporting on targets and commitments made in the Performance Plan
Summary of all targets appearing in the Performance Plan
Performance Targets |
No. |
% |
RED |
29 |
10% |
AMBER |
26 |
10% |
GREEN |
165 |
62% |
NOT KNOWN |
48 |
18% |
TOTAL |
268 |
100% |
RED - Target will not be met
AMBER - There are doubts about meeting the target
GREEN - On or exceeding target
NOT KNOWN - Mainly relates to figures that are collected periodically
KEY PERFORMANCE INDICATORS 2003-2004 |
The Resources and Customer Service Overview & Scrutiny Panel in January 2003 requested more focus on priorities in this Report. Directors, in response to this request, have selected the key indicators below.
A full list of all targets appearing in the Performance Plan is available upon request.
Progress against PSA targets is reported in a separate report on the agenda of this Executive meeting, (January 14th 2004).
Ref No |
Indicator |
Best 25% in 01/02 all English Councils |
BD actual |
02/03 actual |
03/04 target |
03/04 estimate |
Status |
Comment |
3 |
% of citizens satisfied with the Council's overall service |
70 |
N/a |
Not Measured |
58 |
Available shortly |
GREEN |
Measured by a survey of the population in Dec 2003 |
157 |
% of electronic interactions |
45 |
37 |
54 |
63 |
68 |
GREEN |
This figure is based on the current recording system in place |
Local 62 |
Would you recommend the Council as a place to work? |
N/a |
49 |
59 |
62 |
Available shortly |
N/K |
This will be measured by asking a sample of employees In Dec 2003 |
78a |
Speed of Benefits Processing new claims (days) |
35 |
39 |
49 |
40 |
40 |
GREEN |
|
78b |
Average time for processing changes of benefits circumstances (days) |
8 |
6 |
16 |
9 |
9 |
GREEN |
|
80g |
Overall satisfaction with the benefits service |
85 |
N/a |
Not measured |
85 |
85 |
GREEN |
|
8 |
% of undisputed invoices paid within 30 days |
94 |
91 |
90 |
90 |
90 |
GREEN |
|
9 |
% of Council Tax collected |
98 |
96.8 |
96.5 |
97 |
97 |
GREEN |
|
10 |
% of business rates collected |
98.8 |
99.6 |
96.9 |
99 |
98 |
AMBER |
Collection rates are gradually improving and a switch from annual up front payment to direct debit may explain the deficit |
156 |
% of Council buildings suitable for and accessible to disabled people |
47 |
13 |
25 |
35 |
35 |
GREEN |
|
82a+b |
% of household waste recycled |
16 |
23 |
26 |
33 |
30.4 |
AMBER |
Recycling centre problems. Delayed start to Garden Waste & Cardboard scheme |
84 |
Kg of household waste collected per head |
487 |
492 |
500 |
500 |
483 |
GREEN |
|
102 |
Passenger journeys on local buses (millions per annum) |
N/a |
6.7 |
6.8 |
6.95 |
Available shortly |
N/K |
Figures provided by operators at year end |
103 |
% of population satisfied with local provision of public transport information |
53 |
N/a |
Not measured |
39 |
Available shortly |
N/K |
Measured by a survey of the population in Dec 2003 |
Local 58 |
% of delegated Planning applications determined within 8 weeks |
N/a |
63 |
77 |
78 |
76 |
AMBER |
New delegation scheme implemented; will take time to achieve target |
96 |
% of defective principal roads |
6 |
19 |
22 |
21 |
21 |
GREEN |
|
Local 17 |
Average annual room occupancy in hotels and guest houses |
N/a |
N/a |
63.5 |
57 |
Available shortly |
N/K |
No data yet available. Collection of stats is produced at year end |
89 |
% of people satisfied with street cleanliness standards |
71 |
N/a |
Not measured |
71 |
Available shortly |
N/K |
Measured by a survey of the population in Dec 2003 |
Local 53 |
93Streetscene94 issues identified and reported |
N/a |
New |
New |
300 |
2000 |
GREEN |
Introduction of Community Warden scheme has been successful |
38 |
% of 15 year old pupils achieving 5+ GCSEs at grades A*-C |
53 |
57 |
61 |
62 |
60 |
RED |
Good result compared with other similar Councils, but unrealistic target set by Government |
39 (new) |
% of 15 year old pupils achieving 5+ GCSEs at Grade A*-G |
N/a |
N/a |
90.8 |
95 |
92 |
RED |
Good result compared with other similar Councils, but unrealistic target set by Government |
40 |
% of pupils achieving Level 4+ Key Stage 2 Mathematics |
74 |
74 |
78 |
87 |
76 |
RED |
Good result compared with other similar Councils, but unrealistic target set by Government |
41 |
% of pupils achieving Level 4+ in Key Stage 2 English |
78 |
78 |
79 |
87 |
79 |
RED |
Good result compared with other similar Councils, but unrealistic target set by Government |
34a |
% of primary schools with 25%+and 30+ of their places unfilled |
7.4 |
11.5 |
14.7 |
14.7 |
11.8 |
GREEN |
Continued fall in pupil numbers. Primary area review will have an impact in medium term |
34b |
% of secondary schools with 25%+ and 30+ of their places unfilled |
0 |
7.7 |
7.7 |
7.7 |
15.4 |
RED |
Review of secondary education aims to address surplus places. Change in Target for 2003/04 is due to change in method of calculating % of schools with surplus places |
44 |
Number of pupils permanently excluded per 1,000 pupils |
0.85 |
1.7 |
1.4 |
1.7 |
0.9 |
GREEN |
These figures are always reported a year in arrears. 0.9 has already been achieved for 2002/3, but this will not be recorded until 2003/04 |
43a |
% of SEN statements prepared within 18 weeks |
97 |
97 |
95 |
98 |
96 |
AMBER |
This has been changed to a rolling average which more accurately reflects performance. The Team has been affected by staff changes in an area that requires considerable expertise |
126 |
Domestic burglaries per 1,000 population |
8.3 |
21.6 |
16.85 |
15.97 |
15.97 |
GREEN |
|
128 |
Vehicle crimes per 1,000 population |
9.3 |
22.6 |
21.11 |
20.05 |
20.05 |
GREEN |
|
49 |
% of children looked after with three or more care placements during the year |
10 |
12 |
10.1 |
11 |
11 |
GREEN |
|
50 |
% of children looked after who are leaving care aged 16+ with GCSE at grades A*-G or GNVQ |
49 |
60 |
80 |
80 |
60 |
AMBER |
At 80% we were 10% higher than the next highest in the country - 60% ensures we stay within the top 10. |
161 |
% of young people looked after, aged 16, who were engaged in education, training or employment at the age of 19 |
60 |
31 |
45.5 |
40 |
50 |
GREEN |
|
162 |
% of child protection cases reviewed |
100 |
96 |
100 |
100 |
97 |
RED |
One review has failed to meet the much stricter new definition |
C26 |
Supported admissions of older people to residential / nursing care per 10,000 population aged 65+ |
70-100 |
96.2 |
106 estimate |
99 |
123 |
RED |
There has been a significant increase in admissions for elderly people with mental health problems |
53 |
Households receiving intensive home care per 1,000 65 or over |
16 |
4.1 |
4.9 |
5.3 |
5.3 |
GREEN |
Survey analysis ongoing, likely that target will be exceeded |
56 (new) |
Percentage of items of Social Services equipment delivered within seven days |
N/a |
N/a |
New |
80 |
75 |
AMBER |
Performance has been improving -target may be met. Note recent change in indicator definition |
196 (new) |
Assessment of older people in less than 4 weeks |
N/a |
N/a |
New |
80 |
90 |
GREEN |
Statistic based on sample, not all teams surveyed yet |
Local 8 |
New affordable housing units |
N/a |
92 |
78 |
110 |
134 |
GREEN |
|
Local 9 |
% of affordable housing on brownfield sites |
N/a |
N/a |
100 |
60 |
87 |
GREEN |
|
183a |
Homeless households with children in Bed & Breakfast (average time in weeks), |
N/a |
N/a |
7.5 |
4 |
7 |
RED |
An action plan is being implemented |
183b |
Average time (in weeks) in hostels, households with children |
N/a |
N/a |
10.2 |
10 |
16 |
RED |
An action plan is being implemented |
Reduce accidental fire related deaths and injuries in the home |
N/a |
New |
17.4 per 100,000 |
16.0 per 100,000 |
Available shortly |
N/K |
Data is made available at the end of the year |