Schedule of Known Land Acquisitions Required for Bath Package
Section/Property |
Description |
Newbridge Park & Ride |
|
Field to North east of Existing P&R Extension |
Fallow Field. Required for the extension of the park and ride increasing its capacity to deal with projected increased demand |
Land fronting Boat House Car Park and ancillary plots. |
Landscaping. Required to facilitate a dedicated slip road for the expanded park and ride to avoid local congestion. |
Drainage and Ancillary |
Rights across adjoining land to service for example the increased surface water run-off fro the extended park and ride |
Newbridge to Windsor Bridge |
|
Avon Park - Access Lane and Small plot opposite |
Access Serving Somer Estate. Required because of the restricted width available on the former rail trackbed at this point, it will be used to divert pedestrians and cyclists off the main route. Small area of land opposite required to create new junction arrangement as the route joins Brassmill Lane. |
Allotments adjoining Avon Park |
Temporary access required during construction to create a permanent diversion of the cycle/walk way |
Land and Part Paint Shop Rear of Hartwell's Garage |
Parking and Paint shop associated with motor dealership. Temporary access required over access to batching plant to facilitate the construction of this section of the Dedicated Bus Route |
Former Track-bed to east of Hartwell's Garage |
Open Storage used occasionally for storing cars by the adjoining business. Required for the construction of the dedicated bus route |
Land to North Kaynton Mead |
Banked land with steps/ramp. Required because of the restricted width available on the former rail trackbed at this point, it will be used to divert pedestrians and cyclists off the main route. |
Station Road Depot |
Former Depot. Required for the dedicated bus route and associated bus stops. Small area of rough land to south of block of garages is also required to allow for sufficient grading of levels at this point. |
Land North of Hinton Garages, Locksbrook Road |
Land associated with the use of adjoining commercial units. Also small parcel of former trackbed to south of Station House. Both parcels are required for the permanent dedicated bus route and a larger are is required to facilitate construction and grading of levels. |
Section/Property |
Description |
Unit 10, Locksbrook Road |
Electrical Retailer - B1 Unit. It is proposed that this unit is demolished. It is required for the permanent dedicated bus route and grading of levels. |
Porion House, Locksbrook Road |
Plant Hire - B1 Unit. It is proposed that this unit is demolished. It is required for the permanent dedicated bus route and grading of levels. |
43 Ashley Avenue |
Terrace House. Occupied. Part of the gardens of this property will be required for permanent dedicated bus route and a slightly larger area will be needed during construction to allow the erection of retaining wall. |
44 Ashley Avenue |
Terrace House. Occupied. Part of the gardens of this property will be required for permanent dedicated bus route and a slightly larger area will be needed during construction to allow the erection of retaining wall. |
45 Ashley Avenue |
Terrace House. Occupied. Part of the gardens of this property will be required for permanent dedicated bus route and a slightly larger area will be needed during construction to allow the erection of retaining wall. |
46 Ashley Avenue |
Terrace House. Occupied. Part of the gardens of this property will be required for permanent dedicated bus route and a slightly larger area will be needed during construction to allow the erection of retaining wall. |
47 Ashley Avenue |
Terrace House. Occupied. Part of the gardens of this property will be required for permanent dedicated bus route and a slightly larger area will be needed during construction to allow the erection of retaining wall. |
48 Ashley Avenue |
Terrace House. Occupied. Part of the gardens of this property will be required for permanent dedicated bus route and a slightly larger area will be needed during construction to allow the erection of retaining wall. |
Motor Services Bath, Locksbrook Road |
It is proposed that this unit is demolished. It is required for the permanent dedicated bus route and grading of levels, planting etc. |
Land to North East of Motor Services |
Open Storage. It is required for the permanent dedicated bus route and grading of levels, planting etc. |
Section/Property |
Description |
Wessex Water Compound |
Interceptor tank and ancillary. Required for access during the construction period to allow for grading and other works associated with the permanent dedicated bus route |
Former Railway Bridge |
Bridge Infrastructure. Required for the permanent dedicated bus route which crosses the river at this point. Works access during construction process will also be required to the river banks. |
BBC Books, Windsor Bridge Road |
It is proposed that this unit is demolished. It is required for the permanent dedicated bus route and grading of levels. |
Stable Yard, Windsor Bridge |
Small Section of land/wall required for highway upgrade and visibility splay where the dedicated bus route crosses midland bridge road. |
BWR |
|
Land to South Of Gas Governors |
Derelict Land/Open Storage. Required for a potential temporary routing of the dedicated bus route pending completion of the Bath Western Riverside development. Grading of levels. A larger area will be required during construction. |
Former Wessex Water Depot and Stothert and Pitt Premises |
Derelict Land/Open Storage. Required for a potential temporary routing of the dedicated bus route pending completion of the Bath Western Riverside development. Grading of levels. A larger area will be required during construction. |
Land Adjoining Home base |
Derelict Land/Open Storage. Required for the permanent routing of the dedicated bus route pending completion of the Bath Western Riverside development. Grading of levels. A larger area will be required during construction. |
Access Road to Rear of Homebase/Sainsburys Petrol Station |
Access road and associated landscaping. Required for the permanent routing of the dedicated bus route pending completion of the Bath Western Riverside development. Grading of levels. A larger area will be required during construction. |
City Centre |
|
None Known |
|
Section/Property |
Description |
Lower Bristol Road |
|
Land between Herman Miller and Waterside Court |
Frontage Land required for bus lane. Part of a protected highway improvement line. |
Waterside Court, LBR, Bath |
Frontage Land required for bus lane. Part of a protected highway improvement line. |
Land East Waterside Court |
Frontage Land required for bus lane. Part of a protected highway improvement line. |
Unigate Depot |
Frontage Land required for bus lane. Part of a protected highway improvement line. |
Land Junction of Mill Lane, Lower Bristol Road |
Frontage Land required for junction improvements. |
A4 Batheaston Park and Ride |
|
Land for access works - 2/3 Plots |
Embankment/Verge & Rough Pasture. Required to provide access to the new park and ride facility from the A4 trunk road via slip roads and new junction arrangement. |
Land Fronting Lambridge Training Ground |
Rugby Training Ground and associated parking/access. Required to facilitate a new inward bus lane at this point. A wider strip is required to allow construction works to take place. |
Land South West of Roundabout |
Fallow Field. Required for dedicated bus lanes at the roundabout and associated grading of levels. |