Report to Executive
4-Monthly Performance Report
Date |
1st October 2003 |
Reporting Area |
Council Performance |
Lead Director |
Peter Rowntree |
SCOPE OF REPORTING AREA
Bi-annual progress report on all the targets contained in the Council's Performance Plan
208 Performance Targets
30 Commitments
30 PSA Targets
1. Progress / Issue Reporting |
Progress Made |
Issues to be addressed |
Who |
By When |
|
LeadershipUpdates on items in previous report |
· Hyder Business Services, Aquaterra Leisure and Mott MacDonald have been appointed as strategic partners in business support, leisure and transportation respectively |
· Strategic partnership agreements are in place varying between 5 and 10 years and regular progress monitoring will enable efficiencies to be identified and achieved |
Res Dir/Ops Dir/EED Dir |
Ongoing |
· Increasing Customer Satisfaction is a key Council target. Key Performance Indicators are being developed and a full customer satisfaction survey will be carried out Autumn 2003. · Action Plans are included in Service Plans for achieving increased customer satisfaction |
· Further local validation of customer satisfaction through Voice Box survey · The second 3-yearly national customer satisfaction survey is due to take place shortly - comparative information will be available in 2004 to show how we performed against our peers |
Corp Dir |
Dec 03 |
|
· Projects have started as per the timetable published in the Performance Plan |
· 3 improvement projects will begin in 2003/04 (Human Resources, Property, Customer Access and e-government) |
Corp Dir/Res Dir |
Mar 04 |
|
· O&S processes have been improved and documented in the `O&S Toolkit' published on CIS |
· |
Done |
||
LeadershipNew items |
· A working group has been established to develop the Corporate Plan |
· Key Performance Indicators are included in this report and will be integrated with the Corporate Plan being produced for 2004 |
ALL Directors |
Jan 04 |
· The Customer Access programme has successfully launched the first "Infoplus" one stop shop in Midsomer Norton, together with 5 information kiosks and 75 free to use computers in libraries |
· Further locations under consideration, subject to budget agreement |
Corp Dir |
Mar 04 |
|
PeopleUpdates on previous report |
· The development of a Human Resources Strategy is progressing well as part of the Human Resources Improvement Project |
· An action plan will be presented to Members end 2003 for approval to include delivering workforce needs effectively, aligning resources to the priorities of the organisation, employee motivation |
Corp Dir/Ops Dir |
End 2003 |
PeopleNew items |
· Third Staff Survey completed, analysis of the results had lead to areas of improvement and issues being identified |
· Main issues to be addressed - poor response from non-office based staff, good performance appraisals, but doubts about usefulness, variability in the way policies and practices are implemented |
ALL Directors |
Mar 04 |
· Local Government Pay Council consulted on National Employers initial evidence presented in April 2003. The Commission report should be available by Sept 2003 |
· Need to monitor developments at national level, especially Commission's report(s) inc. any pay proposals and consequential impact on Council's financial position. |
Corp Dir |
Mar 04 |
|
· Transfer of Undertakings (Protection of Employment) regulations (TUPE) guarantee negotiated with proposed Leisure partner. Staff fully consulted and involved in Leisure partnership project progress - Trade Unions have praised the process |
· Investment in new facilities will enable staff to develop their careers in the new partnership |
Ops Dir |
Ongoing |
|
· Contract now signed with Hyder Business Services who will now implement Business Improvement Service |
· Business Improvement Service will implement prioritised projects |
Res Dir |
Ongoing |
|
Partnership & Resources Updates on previous report |
· Strategic partnership with Hyder Business Services, Aquaterra and Mott MacDonald now finalised (see above) |
· Identification of priorities will take place through the Corporate Plan |
ALL Directors |
Dec 03 |
Partnership & Resources New items |
· 2002/03 year-end budget position close to expectation, however for 2003/04 several issues are already emerging which will add strain to this year's budget position |
· Lower level of balances will require close monitoring by Directors Group |
Res Dir |
Mar 04 |
· Bath Special schools - £4.9m awarded for delivery of new Special schools in Bath, in addition to major capital investment won for Radstock secondary school |
· Major project needed to deliver this programme |
Edu Dir |
Dec 03 |
|
· Energy Management - study into procurement options underway |
· Will link into Hyder Business Services Partnership project |
Res Dir |
Dec 03 |
|
· The 10 year Leisure partnership transfers most property risks, secures investment and reduces running costs. Recreation Ground issues required an Executive decision to proceed with a lease to be agreed later for Bath Sports Centre |
· Achievement of top 25% performance for the service |
Ops Dir |
Ongoing |
|
· The Housing Corporation has awarded Bath & North East Somerset £2.4m Social Housing Grant for 2003/04 - an increase of £0.5m on last year's allocation · 2002/03 target of £3.3m spent on affordable housing has been achieved with 100 units of accommodation completed on time. This brings the total to 369 since the stock transfer in 1999 |
· 2003/04 target is a further 110 units |
HSS Dir |
||
· Agreement progressing across the ex-Avon authorities on nursing home and residential care fees for 2003/04, for Older People, following work in partnership with representatives of the independent sector |
· Further work on costs of specialist placements for people with Learning Difficulties and people with Mental Health Problems being progressed · Some homes in areas of shortage are raising fees unilaterally |
HSS Dir |
Nov 03 |
|
· Detailed Transport Business Plan sets out need for additional resources to achieve improved Comprehensive Performance Assessment and Local Transport Plan ratings |
· Level of resources applied to future years of financial plan critical to any significant improvement |
EED Dir |
Oct 03 |
|
· Partnership working - since the publication of a District Audit Report in December 2002, a working group has been established to help the Council to meet the key recommendations |
· All partnerships need to be mapped to identify the contribution to Council's priorities and objectives, and alignment with the Local Strategic Partnership · Policy and partnership engagement plans need to be agreed which address the concerns raised in the District Audit report 2002 |
Corp Dir |
Dec 03 |
|
· Local Strategic Partnership (LSP) held its first Annual General Meeting in June 2003. Council Leader Paul Crossley was elected as chair and Liz McIntyre, from Learning Partnerships as Vice Chair. |
· Membership and operation of LSP to be reviewed by LSP, and any proposals for change will need to be put to B&NES Council |
Corp Dir |
Dec 03 |
|
Policy and Strategy Updates on previous report |
· Development of Draft Community Strategy · Consultation on the draft Community Strategy, supported by an extensive publicity campaign. |
· The outcomes of this consultation will be collated and analysed in mid September, results of consultation to be incorporated in final version · Final draft of the Community Strategy will be issued in October · A comprehensive response at both political and practical level is required by all services · Aspirations within the Strategy will be considered within the Corporate Plan |
ALL ALL |
Oct 03 Dec 03 |
· The Comprehensive Performance Assessment identified the lack of a Corporate Plan as a weakness |
· A Corporate Plan will be developed end financial year 2003/2004. Need to ensure that issues arising from the draft Community Strategy and Corporate Plan are given due regard in Service Plans |
ALL |
Mar 04 |
|
· The Public Service Agreement (PSA) was agreed in August. It contains 30 targets that will stretch our performance beyond that expected without PSA funding. There is £919,000 of pump-priming available to support the new targets |
· Interim targets and monitoring processes need to be finalised |
Ops Dir |
Nov 04 |
|
Policy and Strategy New items |
· The Housing Strategy for Bath & North East Somerset 2002-2011 achieved an "above average" rating, but did not meet all the "Fit For Purpose" criteria (only one local housing authority in the Country met all the FFP criteria). The work required to achieve the criteria and a submission date for a revised Strategy have been agreed with Government Office for South West |
· The `affordable housing strategy' workplan has been extended for completion in December 2003 to allow for involvement of Overview & Scrutiny. Discussions and investigations underway as to how Overview & Scrutiny can be involved in this policy development |
HSS Dir |
End 03 |
· The Review of Homelessness and the Homelessness Strategy document was completed and published at the end of July 2003 |
· |
|||
· The consultation exercise on the Housing Renewal Policy has been completed |
· The comments received on the Housing Renewal Policy were generally positive, however the response rate was disappointing |
HSS Dir |
Oct 03 |
|
· Library Vision approved by the Executive Member and will now be implemented |
· Library staff restructure to ensure Vision achieved |
Corp Dir |
Dec 03 |
|
· Plan For Sport being written |
· Full strategy to be developed next quarter - will focus on social benefits of sports participation |
Ops Dir |
Mar 04 |
|
· 20 Year transportation vision consultation complete |
· 20 year Transport vision will be integrated into the Community Strategy and Corporate Plan |
EED Dir |
Oct 03 |
|
Processes Updates on previous report |
· The Council's performance plan was published in June 2003 reporting actual results rather than estimates as in previous years. Estimates have overstated the end of year position by about 10%. |
· A greater scrutiny of progress throughout the year will be supported by an increase in performance reporting. |
ALL |
Mar 04 |
· Business Process Change pilots have been implemented in Revenues and Benefits and Planning |
· Revenues & Benefits amalgamation and call centre improvements have been slower than planned to achieve effectiveness. Action Plans are in place for review end 03 · A pilot group of 6 staff have received Change Management coaching. This group will support the work of teams delivering change management projects, i.e. Customer Access Programme |
Res Dir Corp Dir |
End 03 End 03 |
|
· Roll out of Electronic Data Management is progressing |
· Revenues and Benefits have installed electronic document software. The new Agresso financial system will incorporate the scanning of all invoices. Planning Services will prepare a business case to scan all planning applications |
Corp/EED Dirs |
Mar 04 |
|
Processes New items |
· The annual complaints report has been drafted and is being analysed |
· Annual Complaint report will be published in November · The Corporate Complaints Procedure is being reviewed with new corporate guidelines available shortly |
Ops Dir/ Solicitor |
End 03 |
· To complement revised Service & Budget Planning the Performance Management System is being reviewed to incorporate best practice · We are one of only 2 Unitary Councils with an "excellent" performance management system (Comprehensive Performance Assessment report 2002) |
· A Head of Service Performance Sub-Group will develop proposals to enhance performance management and systems |
Ops Dir |
Mar 04 |
|
· Passenger Transport Client Group established |
· Provides forum for issues between client representatives and service providers as recommended in the Best Value Inspection Report |
EED Dir |
Oct 03 |
|
· Agreement in principle has been reached to establish a single point of entry for a range of adult care and primary care trust related services, including intermediate care, at Lewis House |
· |
|||
· Audit of services against recommendations of Climbie Inquiry Report completed and submitted to SSI. Report broadly very positive with some areas for improvement |
· Implement report action plan |
HSS Dir |
Dec 03 |
|
· Over 7,000 Active Leisure Cards currently in use including 1,200 annual memberships & 1,300 advance booking. · 8,500 B&NES Resident's Discovery Cards (for museums) issued |
· Maintain and update membership to ensure maximum effectiveness |
Ops Dir |
Mar 04 |
|
· Homeless numbers have increased partly due to increased demand (while supply of permanent homes is static) and partly because of the introduction of the Lettings and Choice pilot scheme where homeless households are deciding to stay in temporary accommodation longer while they wait for a better home |
· Good progress has been made to reduce the number of outstanding nominations under the Choice Based lettings Pilot. The policy is now being reviewed and the system refined to simplify processes. Extra resources are being examined |
HSS |
Oct 03 |
Glossary - Directors - Ops = Operations, HSS = Housing & Social Services, EED = Economic & Environment Director, Corp = Corporate Director, Res = Resources, Edu = Education
2. Reporting on targets and commitments made in the Performance Plan
Summary of Performance at 29th August 2003 (does not include 30 PSA targets, see below)
Performance Targets |
No. |
% |
RED |
13 |
5% |
AMBER |
18 |
8% |
GREEN |
158 |
66% |
NOT KNOWN |
49 |
21% |
TOTAL |
238 |
RED - Target will not be met
AMBER - There are doubts about meeting the target
GREEN - On or exceeding target
NOT KNOWN - Mainly relates to figures that are collected periodically
KEY PERFORMANCE INDICATORS 2003-2004 |
The Resources and Customer Service Overview & Scrutiny Panel in January 2003 requested more focus on priorities in this Report. The indicators below respond to this request but will be updated when the Corporate Plan has been agreed later in 2003/04. The full list of all targets appearing in the Performance Plan, summarised above, is available upon request.
Ref No |
Indicator |
Best 25% in 01/02 all English Councils |
01/02 actual |
02/03 actual |
03/04 target |
03/04 estimate |
Status |
Comment |
3 |
% of citizens satisfied with the Council's overall service |
70 |
N/a |
Not Measured |
58 |
N/K |
Measured every 3 years - next survey in November, although local research is done in "Voicebox" (54% in Apr 2003 although not statistically comparable) |
|
157 |
% of electronic interactions |
45 |
37 |
54 |
63 |
GREEN |
||
Local 62 |
Would you recommend the Council as a place to work? |
N/a |
49 |
59 |
62 |
62 |
GREEN |
Will be measured through a sample of the workforce annually |
78a |
Speed of Benefits Processing - new claims (days) |
35 |
39 |
49 |
40 |
40 |
GREEN |
|
78b |
Average time for processing changes of benefits circumstances (days) |
8 |
6 |
16 |
9 |
9 |
GREEN |
|
80g |
Overall satisfaction with the benefits service |
85 |
N/a |
Not measured |
85 |
85 |
GREEN |
|
8 |
% of undisputed invoices paid within 30 days |
94 |
91 |
90 |
90 |
90 |
GREEN |
|
9 |
% of Council Tax collected |
98 |
96.8 |
96.5 |
97 |
97 |
GREEN |
|
10 |
% of business rates collected |
98.8 |
99.6 |
96.9 |
99 |
99 |
AMBER |
Some large businesses have chosen to change the method of payments from a lump sum to more spread throughout the year, adding uncertainty to the end of year position |
156 |
% of Council buildings suitable for and accessible to disabled people |
47 |
13 |
25 |
35 |
35 |
GREEN |
|
82a+b |
% of household waste recycled |
16% |
23% |
26% |
33% |
30% |
AMBER |
Very high Govt. imposed target based on previous good performance. There have been delays with the roll-out of the green waste and cardboard collections |
84 |
Kg of household waste collected per head |
487 |
492 |
500 |
500 |
490 |
GREEN |
|
102 |
Passenger journeys on local buses (millions per annum) |
N/a |
6.7 |
6.8 |
6.95 |
No Data |
N/K |
Figures provided by operators at year end |
103 |
% of population satisfied with local provision of public transport information |
53 |
N/a |
Not measured |
39 |
No Data |
N/K |
Measured every 3 years - next survey in November (Apr 03 Voicebox 21%) |
Local 58 |
% of delegated Planning applications determined within 8 weeks |
N/a |
63 |
77 |
78 |
76 |
AMBER |
Too early to assess impact of new delegation scheme introduced in May 2003. May pick up later in the year to meet target. |
96 |
% of defective principal roads |
6 |
19 |
22 |
21 |
21 |
GREEN |
|
Local 17 |
Average annual room occupancy in hotels and guest houses |
N/a |
N/a |
63.5 |
57 |
No Data |
N/K |
Collection of these stats is outside our control and is produced a quarter in arrears |
89 |
% of people satisfied with street cleanliness standards |
71 |
N/a |
Not measured |
71 |
No Data |
N/K |
Measured every 3 years - next survey in November (Apr 03 Voicebox 47%) |
Local 53 |
"Streetscene" issues identified and reported |
N/a |
New |
New |
300 |
1500 |
GREEN |
|
38 |
% of 15 year old pupils achieving 5+ GCSEs at grades A*-C |
53 |
57 |
61 |
62 |
60 |
AMBER |
Provisional result to be confirmed |
39 (new) |
% of 15 year old pupils achieving 5+ GCSEs at Grade A*-G |
N/a |
N/a |
90.8 |
95 |
87 |
RED |
Every pupil now has to sit English & Maths, therefore failure rate is higher |
40 |
% of pupils achieving Level 4+ Key Stage 2 Mathematics |
74 |
74 |
78 |
87 |
76 |
RED |
Unrealistic target set by Govt. This will change next year. |
41 |
% of pupils achieving Level 4+ in Key Stage 2 English |
78 |
78 |
79 |
87 |
78 |
RED |
Unrealistic target set by Govt. This will change next year. |
34a |
% of primary schools with 25%+and 30+ of their places unfilled |
7.4 |
11.5 |
14.7 |
14.7 |
14.7 |
GREEN |
|
34b |
% of secondary schools with 25%+ and 30+ of their places unfilled |
0 |
7.7 |
7.7 |
7.7 |
No Data |
N/K |
Changed method of measuring capacity |
44 |
Number of pupils permanently excluded per 1,000 pupils |
0.85 |
1.7 |
1.4 |
1.7 |
No Data |
N/K |
|
43a |
% of SEN statements prepared within 18 weeks |
97 |
97 |
95 |
98 |
100 |
GREEN |
|
126 |
Domestic burglaries per 1,000 population |
8.3 |
21.6 |
16.85 |
15.97 |
No Data |
N/K |
Statistics are reported on an annual basis from the Police |
128 |
Vehicle crimes per 1,000 population |
9.3 |
22.6 |
21.11 |
20.05 |
No Data |
N/K |
Statistics are reported on an annual basis from the Police |
49 |
% of children looked after with three or more care placements during the year |
10 |
12 |
10.1 |
11 |
8 |
GREEN |
|
50 |
% of children looked after who are leaving care aged 16+ with GCSE at grades A*-G or GNVQ |
49 |
60 |
80 |
80 |
No Data |
N/K |
Exam data collected in autumn |
161 |
% of young people looked after, aged 16, who were engaged in education, training or employment at the age of 19 |
60 |
31 |
45.5 |
40 |
No Data |
N/K |
|
162 |
% of child protection cases reviewed |
100 |
96 |
100 |
100 |
100, old definition |
AMBER |
Confirmation of full operational definition of revised indicator still being sought from ODPM/DoH |
C26 |
Supported admissions of older people to residential / nursing care per 10,000 population aged 65+ |
70-100 |
96.2 |
106 estimate |
99 |
(This indicator does not appear in this year's BVPP) |
||
53 |
Households receiving intensive home care per 1,000 65 or over |
16 |
4.1 |
4.9 |
5.3 |
No Data |
N/K |
Annual survey in September |
56 (new) |
Percentage of items of Social Services equipment delivered within seven days |
N/a |
N/a |
New |
80 |
70 |
RED |
It is proving difficult to meet the 7 day target for equipment which requires minor adaptations to dwellings |
196 (new) |
Assessment of older people - & less than 4 weeks |
N/a |
N/a |
New |
80 |
No Data |
N/K |
Still trying to get SW teams to record data on client database |
Local 8 |
New affordable housing units |
N/a |
92 |
78 |
110 |
116 |
GREEN |
|
Local 9 |
% of affordable housing on brownfield sites |
N/a |
N/a |
100 |
60 |
77 |
GREEN |
|
183a |
Homeless households with children in Bed & Breakfast (average time in weeks), |
N/a |
N/a |
7.5 |
4 |
4 |
GREEN |
|
183b |
Average time (in weeks) in hostels, households with children |
N/a |
N/a |
10.2 |
10 |
16 |
RED |
Further management action required to ensure that stays by households with children in hostels are limited |
Reduce accidental fire related deaths and injuries in the home |
N/a |
17.4 per 100,000 |
16.0 per 100,000 |
(This indicator does not appear in this year's BVPP) |
PUBLIC SERVICE AGREEMENT 2003-2006 |
The PSA was agreed in August 2003. Interim targets will be developed so that performance can be monitored. These will be available for the next Report in January.
3.
5.
6.
7.
9.
11.
12.
15.
16.
17.
18.
21.
22.
24.
26.
27.
29.
30.
Theme |
Performance Measure |
Base Line |
PSA Target |
1. Cost-performance index |
Improvement in the economy, efficiency and effectiveness of local services |
100 |
107.5 |
2. Increasing Bus Usage |
Local bus journeys (millions) (Target is accumulative over 2 years) |
6.730m |
14.055m |
Percentage satisfied with public transport information |
34% |
55% |
|
4. Improving the quality of life and independence of older people |
Households receiving intensive home care per 1,000 population aged 65 or over |
4.1 |
8.5 |
Number of people aged 65 years and over who received 5 or more hours of home care over a minimum of 6 visits a week for a period of four or more continuous weeks during the year |
444 |
550 |
|
Older people aged 65 or over receiving a Direct Payment |
3 |
26 |
|
Supported admissions of older people to permanent residential /nursing care per 10,000 population aged 65 or over |
96.2 |
92.0 |
|
8. Improving pupil attendance in secondary schools |
Percentage of half days missed due to absence in secondary schools |
8.1% |
7.1% |
Percentage of half days missed due to unauthorised absence in secondary schools |
1.1% |
0.7% |
|
10. Improving educational attainment for young people leaving care |
Number of young people leaving care aged 16+ obtaining 5 or more GCSEs at grades A*-C (Target is accumulative over 2 years) |
0 |
4 |
Percentage of Children Looked After who are engaged in education, training or employment at the age of 19 |
30% |
75% |
|
Number of young people leaving care aged 16 or over with at least 1 GCSE at grade A* - G or a GNVQ (Target is accumulative over 2 years) |
6 |
16 |
|
13. Reducing vehicle crime |
Number of vehicle crimes |
3,766 |
2,520 |
14. Improving our Local Environment |
Percentage of trade waste (including rubble) which is recycled |
0.56% |
3.00% |
Percentage of household waste at Household Waste and Recycling Centres which is recycled |
33.21% |
38% |
|
Percentage of graffiti cleared from public buildings within 2 working days of reporting |
30% |
95% |
|
Visitor survey: Score for availability of public toilets |
3.03 |
3.37 |
|
Visitor survey: Score for cleanliness of public toilets |
3.53 |
3.70 |
|
19. Reducing the incidence of accidental fire-related deaths and injuries in the home |
Number of deaths and injuries arising from accidental fire in dwellings per 100,000 population (2-year mean) |
17.4 |
13.1 |
20. Improving access to sustained employment to people with disabilities |
Number of disabled people helped by the Council into sustained employment of 16 hours or more per week lasting for at least 13 weeks |
7 |
93 |
Number of disabled people helped by the Council to enter voluntary work of 8 hours or more per week lasting for 13 weeks or more |
6 |
88 |
|
Number of employers who hold the `Positive About Disabled People' award given by Jobcentre Plus |
7 |
19 |
|
23. Promoting healthier lifestyles by increasing regular participation in sport and physical activity |
Number of visits to sports centres to participate in physical activity as recorded by sports centre till records (millions) |
1.048m |
1.150m |
Number of people attending sports centres, not with a club or school group, to participate in a physical activity twice a week or more |
3,700 |
6,160 |
|
25. Providing better alternatives to bed and breakfast for people seeking help for homelessness |
Number of families in Bed & Breakfast accommodation for more than 4 weeks |
13 |
0 |
Total household nights spent in Bed and Breakfast |
12,295 |
7,377 |
|
Percentage of homelessness applications on which the authority makes a decision and issues written notification to the applicant within 33 working days |
74% |
95% |
|
Number of visits to public libraries |
799,734 |
875,281 |
|
Percentage of residents satisfied with libraries |
64% |
80% |
|
Number of books and spoken word items issued |
972,842 |
1,035,026 |