14/09/2022 - Bath Quays North ref: 1770 Approved
This decision relates the contractual
agreements for the provision of electrical infrastructure works by
utility providers at Bath Quays North (BQN). Approval is sought to
novate the “Council/Western Power Distribution (WPD), Point
of Connection agreement (PoC)” to “PowerOn Connections
Ltd (PowerOn)”.
Novation has been recommended by the Councils development partner
(L&G). The novation will allow PowerOn to have sole
responsibility for the management and co-ordination of the
electrical installation direct with WPD. The novation will also
place control of electrical supply with PowerOn.
PowerOn has been appointed by the Council for the main electrical
infrastructure works. The appointment arises through the BQN Early
Works agreement and is managed by L&G and their development
manager.
Background:
The Council has appointed L&G as its development partner for
the Bath Quays North (BQN) regeneration development. To secure the
electrical capacity for BQN, a point of connection (PoC) was
procured with WPD. During the course of 2021 and 2022, PowerOn have
been engaged by L&G to execute off site preparatory works, the
installation of a temporary substation and diversionary works
co-ordination. It is recommended that the WPD PoC agreement is now
novated to PowerOn to allow direct management control of WPD by
PowerOn.
Novation Contractual Matters.
Novation of the WPD PoC agreement to PowerOn will take place using
WPD standard terms of contract. The novation agreement has been
signed by PowerOn and requires the signatures of the Council and
WPD.
Additional assurances have been agreed between the Council and
PowerOn and recorded in a side letter agreement. The side letter
agreement is to be executed simultaneously with the
Council/WPD/PowerOn novation.
Decision Maker: Director of Regeneration & Housing
Decision published: 22/09/2022
Effective from: 14/09/2022
Decision:
Decision:
Novate the WPD PoC agreement to PowerOn Connections Ltd under the
WPD standard novation agreement terms.
Enter into a further side letter agreement between the Council and
PowerOn Connections Ltd.
Lead officer: Simon Martin
21/09/2022 - York Street - Phase 2 Vault Repairs: Additional Budget ref: 1769 Approved
To fund the completion of committed highways
works to York Street to replace waterproofing above the vault and
reconstruct the road to complete the repairs and reduce risk of any
premature failure of the vault in the future. At the same time to
improve the public realm in York Street between Kingston Parade and
Stall street and the northern section of Swallow Street which
included resurfacing in in high-quality natural stone.
Decision Maker: Director of Sustainable Communities
Decision published: 21/09/2022
Effective from: 21/09/2022
Decision:
To fully approve capital amounting to
£175k from capital contingency.
Lead officer: Maria Newton
14/09/2022 - Local Plan Partial Update: Main Modifications ref: 1768 Approved
The Local Plan Partial Update (LPPU) has been
prepared in order to ensure that, upon its adoption, the Council's
planning policy framework better addresses the climate and
ecological emergencies and that the Core Strategy housing
requirement can be met in a plan-led manner. As such it needs to be
adopted as swiftly as possible.
The LPPU is currently being examined by a Planning Inspector. The
Inspector requires that some changes (known as Main Modifications)
are needed to the LPPU for soundness. These Main Modifications need
to be subject to public consultation for a period of six weeks
prior to the Inspector issuing his final Report and the LPPU
progressing towards adoption.
The main modifications need to be agreed for public consultation as
a matter of urgency. Given the time critical and urgent nature of
the decision it has been delegated to Sophie Broadfield, Director
of Sustainable Communities, in consultation with Group Leaders and
the Chair of the Council under rule 3.4.3
Decision Maker: Director Development and Public Protection
Decision published: 14/09/2022
Effective from: 14/09/2022
Decision:
To agree the Schedule of Main Modifications to
the LPPU for consultation for a period of 6 weeks.
To agree the Schedule of Additional Modifications to the LPPU for
publication (not consultation).
Lead officer: Sophie Broadfield