Executive Forward Plan

Bath & North East Somerset Council

May 2009 Return to List of Forward Plans

Click here for Help and explanation of abbreviations

Note: The Council's Consultation Policy may be viewed at  http://www.bathnes.gov.uk/BathNES/councilanddemocracy/consultations/default.htm

Ref Type Title
Issue
Decision Maker Report Author
Contact
Consultation Arrangements Background Papers Directors Group Lead
ITEMS PREVIOUSLY LISTED IN THE FORWARD PLAN BUT NOW WITHDRAWN
E1914   Public Conveniences - Lease Agreement Reason for Withdrawal: Radco have pulled out of negotiations, so no Cabinet decision will be required
E1940   Proposed Waiting Restrictions - Monmouth Road, Ludlow Close, Keynsham Reason for Withdrawal: No Objections were received by the advertised date so the proposals will be implemented without the need for a Cabinet member decision
E1974   Acceptance of funding offer from Homes and Communities agency to stabilise a further mine in Combe Down Reason for Withdrawal: The decision will be taken by the Chief Executive under delegated authority, so no Cabinet member decision is required
INDIVIDUAL CABINET MEMBER ITEMS LISTED AS OUTSTANDING FROM PREVIOUS MONTHS
E1954 KEY Heritage Services Revised Business Plan 2009-2014
The Heritage Services Business Plan 2009-2014 sets out a strategy for investment, principally related to the Roman Baths and Pump Room complex, that will sustain its position as one of the UK's leading visitor attractions, transform its accessibility ot a range of audiences and deliver the return the Council expected by its Financial Plan.
Cllrs Terry Gazzard, Malcolm Hanney Stephen Bird
01225
477750
OS  St  SU  151 HeritageServs Annual Review 2007/08
HeritageServs Business Plan 2005-2010
HeritageServs Long Term Business Plan Funding Paper to Council Exec Sept 2004
GC
WEST of ENGLAND JOINT TRANSPORT COMMITTEE - 24 APR 2009
E1961 WoE Consultation on the Rail Utilisation Strategy
To meet the rail industry to identify the impact and opportunities of the Rail Utilisation Strategy and to provide preliminary views
WoE Joint Transport Committee Terry Wagstaff
CX, WoE Partnership
0117
922 2639
    GC
E1962 WoE RFA2 Programme: Project Management Arrangements
To approve the project management arrangements and resources for future transport schemes
WoE Joint Transport Committee Terry Wagstaff
CX, WoE Partnership
0117
922 2639
    GC
E1963 WoE Joint Transport Asset Management Plan
To approve the Joint Transport Asset Management Plan
WoE Joint Transport Committee Terry Wagstaff
CX, WoE Partnership
0117
922 2639
    GC
E1964 WoE Greater Bristol Bus Network (GBBN)
To consider the progress made on the implementation of the Greater Bristol Bus Network project
WoE Joint Transport Committee Terry Wagstaff
CX, WoE Partnership
0117
922 2639
    GC
INDIVIDUAL URGENT CABINET MEMBER DECISIONS MADE IN APRIL 2009
E1979 R16 Bus Service 20A/C and Ticket Implications: Consider retention of bus service 20A/C and others in consequence of service reductions by First; and whether the Council as Local Transport Authority should make a ticket scheme covering Bath under sections 135-138 of the Transport Act 2000. Note: This decision was taken under Rule 16 of the Council's procedures for urgent Cabinet decisions and published in the Weekly List on 03-Apr-09. Cllr Charles Gerrish Andy Strong
Richard Smith
01225
477604
Cab  CX  Mon  151   GC
CABINET MEETING - 06 MAY 2009, 5pm
E1986 KEY Public Realm & Movement Strategy
To report the results of the public consultation to secure adoption of the strategy as Council Policy
Cllr Terry Gazzard Rhodri Samuel
01225
477452
WC  OS  Int  LR  CIG  SP  PSB  CX  Mon  151 Report for Cabinet (05-Nov-08) and EED O&S Panel (13-Jan-09) JB
E1987 KEY Economic Downturn - Council Response
Update on the effects of the recession and the Council's response following Corporate Plan refresh in February
Cllr Francine Haeberling Andrew Pate
01225
477300
CX  Mon  151 Corporate Plan refresh - February 2009 & Council Budget Report - February 2009 AP
WEST of ENGLAND JOINT WASTE MANAGEMENT COMMITTEE - 21 MAY 2009
E1922 WoE Joint Waste Strategy Phase 2 contract: Contract award
The Joint Waste Management Committee has been established by the four West of England authorities to facilitate their working together on waste management functions.  The report to be considered under delegated powers is to recommend the approval of the contract award for the Phase 2 Interim treatment capacity contract.
WoE Joint Waste Management Committee Terry Wagstaff
CX, WoE Partnership
0117
922 2639
West of England Joint Waste Strategy (May 2008) - www.rubbishorresource.co.uk;  Cabinet report E1765 25th June 2008 - West of England Waste Management & Planning Partnership - Joint Residual Municipal Waste Management Strategy. GC
INDIVIDUAL CABINET MEMBER DECISIONS ANTICIPATED IN MAY 2009
E1034 KEY Cotswolds AONB Conservation Board Funding Agreement
Provision of ongoing funding for the Cotswolds AONB, through an agreement with the newly formed Cotswolds Conservation Board set up under the powers of the countryside and Rights of Way Act 2000
Cllr Charles Gerrish Sue Murtagh
01225 477618
Cab    GC
E1833 KEY Bath Festivals Ltd: Contract for Services 2009-2011
A new contract for the two years 2009-2011 for services to be delivered by Bath Festivals Ltd is to be agreed.  Services to be delivered by Bath Festivals Ltd comprise: festivals development, marketing and box office (services supplied to all arts and cultural organisations in Bath and North East Somerset); administrative support for B&NES Cultural Forum (benefiting all cultural organisations in the area); Bath International Music Festival; Bath Literature Festival; education programme for both these festivals.
Cllr Terry Gazzard Ann Cullis
David Lawrence
01225
396455
OS  Cab  Int  SU  SP  Mon  151 Arts Development Strategy 2008-2011 GC
E1927   Agreement for the Supply of Thermal Waters to the proposed Gainsborough Hotel, Bath
The Council has been in negotiation with the developers of the Gainsborough Hotel in order to supply a fixed quantity of thermal water for treatments and limited bathing. The Water Supply Agreement is now complete. The decision is a request to sign the necessary documents
Cllrs Terry Gazzard, Malcolm Hanney David Lawrence
01225
395385
Cab  SP  CX  Mon  151   GC
E1939 TRO Locksbrook Road - Proposed 20mph Limit & 3.5 Tonne Weight limit
To impose a 20mph speed limit along Locksbrook Road and various adjoining roads to increase pedestrian safety
Cllr Charles Gerrish Andy Coles
01225
394208
WC  St  Int  SU  LR  CIG  PSB   GC
E1957 KEY Public Realm - Wayfinding
To agree project scope and budget for the design and delivery of a Public Realm (Wayfinding) project for the city centre of Bath
Cllr Terry Gazzard Rhodri Samuel
01225
477452
Int  Mon  151 Cabinet Paper, November 2008: Public Realm & Movement Strategy for Bath City Centre - Draft for Consultation JB
E1958 KEY Technical approval of capital projects for 2009/10 not yet approved by Council
As budget report in Council meeting of 17 February 2009, some capital items in italics require further Single Member sign off as detailed in budget action plans; this decision will approve capital spend for items which have passed through the appropriate Capital Review Process
Cllr Malcolm Hanney Meriel Rosser
01225
477312
Cab  CX  Mon  151 Council papers meeting 17 Feb 09;
Various SMD papers relating to individual projects
AP
E1971   Bristol City Council Core Strategy, Preferred Options Review February 2009
Bristol City Council has recently published its Core Strategy Preferred Options Review for consultation. This report outlines the proposed response to this document for consideration by Cabinet Member for Customer Services.
Cllr Charles Gerrish Richard Daone
01225
477546
  Bristol City Council Core Strategy Preferred Options Review, February 2009 GC
E1973 TRO Objection to Proposed Zebra Crossing in St. Ladoc Road, Keynsham
To consider an objection to the proposed installation of a Zebra crossing in St. Ladoc Road, Keynsham
Cllr Charles Gerrish Richard Akehurst
01225
395160
WC  TC  LR  Mon  151   GC
E1978 TRO The Recreation Ground Car Park Order (PEV5297)
To introduce a Traffic Regulation Order to control parking on the Recreation Ground, Bath
Cllr Charles Gerrish Dorothy Miley
01225
394231
WC  Int  CTB   GC
E1980 TRO Audley Park Road Area prohibition and restriction of waiting (PEV5327)
To consider any objections raised following advertisement of the Traffic Regulation Order
Cllr Charles Gerrish Dorothy Miley
01225
394231
WC  Int  LR   GC
E1981 TRO Various Roads Bloomfield Bath Prohibition and restriction of waiting Residents Parking Places (PEV5296)
To consider any objections raised following advertisement of the Traffic Regulation Order
Cllr Charles Gerrish Dorothy Miley
01225
394231
WC  Int  LR   GC
E1982 TRO Outer Road Area Bath residents and Controlled Parking Zone 7 (PEV5295)
To consider any objections raised following advertisement of the Traffic Regulation Order
Cllr Charles Gerrish Dorothy Miley
01225
394231
WC  Int  LR   GC
E1988 KEY Broadband infrastructure improvements for schools
The Harnessing Technology Grant allocated by DCSF is to be used to support an infrastrunture improvement in the broadband links to schools
Cllr Chris Watt Richard Morgan
01225
395220
Int  SU  SP  151 School Forum report AA
E1990 TRO Durley Hill, Keynsham - Increasing Prohibition of Waiting
To increase the length of the double yellow lines on Durley Hill, outside the Restawhile café
Cllr Charles Gerrish Andrew Coles
01225
394208
WC  St  LR  PSB   GC
E1996 KEY Technical approval of Adult Services capital projects for 2009/10 not yet approved by Council
As budget report in Council meeting of 17 February 2009, some capital items in italics require further Single Member sign off as detailed in budget action plans; this decision will approve capital spend for items which have passed through the appropriate Capital Review Process
Cllrs Malcolm Hanney, Vic Pritchard Meriel Rosser
01225
477312
CX  Mon  151 Council papers meeting 17 Feb 09;
Various SMD papers relating to individual projects
AP
E1997 KEY Technical approval of Childrens Services capital projects for 2009/10 not yet approved by the Council
As budget report in Council meeting of 17 February 2009, some capital items in italics require further Single Member sign off as detailed in budget action plans; this decision will approve capital spend for items which have passed through the appropriate Capital Review Process
Cllrs Malcolm Hanney, Chris Watt Meriel Rosser
01225
477312
CX  Mon  151 Council papers meeting 17 Feb 09;
Various SMD papers relating to individual projects
AP
E1998 KEY Technical approval of Customer Services and D&MP capital projects for 2009/10 not yet approved by Council
As budget report in Council meeting of 17 February 2009, some capital items in italics require further Single Member sign off as detailed in budget action plans; this decision will approve capital spend for items which have passed through the appropriate Capital Review Process
Cllrs Malcolm Hanney, Charles Gerrish, Terry Gazzard Meriel Rosser
01225
477312
CX  Mon  151 Council papers meeting 17 Feb 09;
Various SMD papers relating to individual projects
AP
E1999 KEY Technical approval of Customer Services capital projects for 2009/10 not yet approved by Council
As budget report in Council meeting of 17 February 2009, some capital items in italics require further Single Member sign off as detailed in budget action plans; this decision will approve capital spend for items which have passed through the appropriate Capital Review Process
Cllrs Malcolm Hanney, Charles Gerrish Meriel Rosser
01225
477312
CX  Mon  151 Council papers meeting 17 Feb 09;
Various SMD papers relating to individual projects
AP
INDIVIDUAL CABINET MEMBER DECISIONS ANTICIPATED IN JUNE 2009
E1943 TRO Traffic Regulation Order to prohibit vehicles wider than 3ft 3in along Birchwood Lane (Woollard), Ringspit Lane (Hursley Hill) and Mill Lane (Priston)
This decision will be required only if objections are received to the proposed Traffic Regulation Order
Cllr Charles Gerrish Trevor Johnson
01225
394216
WC  PC   GC
E1952 KEY Review of Primary School Provision in Central Bath and North East Somerset - Area 2
A review of primary school provision in Central Bath and North East Somerset - Area 2 has been undertaken by the Children and Young People Overview and Scrutiny Panel. This report  sets out the findings of the Panel and their recommendations
Cllr Chris Watt Helen Hoynes
01225
395169
WC  OS  SU  SP  Mon  151 School Organisation Plan 2003-2008. A Review of Primary Schools in Central Bath and North East Somerset - Area 2 - A Discussion Paper. Children and Young People Overview and Scrutiny report - Review of Primary School Provision in Central Bath and North East Somerset - Area 2. AA
E1984 KEY Adult Social Services & Housing Complaints Procedure Annual Report April 2008 - March 2009
The objective of the Complaints Procedure is to address individual concerns about the delivery, quality and appropriateness of services provided by Adult Social Services & Housing
Cllr Vic Pritchard Sarah Watts
01225
477931
Cab  Mon  151   JA
E1989 KEY Supporting Young People Strategy
This report details the strategy for the development and delivery of integrated youth support services for young people in Bath and North East Somerset
Cllr Chris Watt Maurice Lindsay
01225
396289
OS  TU  St  Int  SU  YC  SP  Mon  151 Development of Integrated Youth Support Services in B&NES -  Report E1746 May 2008 to Cabinet Member Children's Service AA
E2000 KEY Multi Operator Ticketing Scheme for Bus Services in Bath
To consider whether to make a Bus ticket scheme for day tickets and season tickets under the powers of sections 135-138 of the Transport Act 2000 with effect from September 2009
Cllr Charles Gerrish Richard Smith
01225
477604
SU  CIG  SP  PSB  Mon  151 E1979 -  Bus Service 20A/C Contracts and Ticketing Implications GC
CABINET MEETING - 08 JULY 2009, 5pm
E1699   Performance Report 2008/9
2008/9 end-of-year performance report
Cllr Francine Haeberling Dave Thompson
Joe Duncan
01225
396379
Cab  CX  Mon  151 Previous Council Performance Reports DT
E1909 KEY Adoption of the Planning Obligations Supplementary Planning Document
The document will be recommended for adoption, comments made during the consultation will be reported and amendments taken on board
Cllr Charles Gerrish Simon de Beer
Cleo Newcombe-Jones
01225
477617
WC  PC  TC  St  Cab  Int  LR  CIG  SP  PSB  CX  Mon  151   GC
E1949 KEY West of England Multi Area Agreement
The Multi Area Agreement (MAA) is being led by the West of England Partnership and aims to set out an agreed way of working between the West of England and central Government about how to tackle the priorities for the region
Cllr Francine Haeberling David Trethewey
Sarah Flitter
01225
477807
Cab  PSB  CX  Mon  151   AP
E1950 KEY  PBF Bath & North East Somerset Sustainable Community Strategy Refresh
This item seeks to present the refresh of the Bath & North East Somerset Sustainable Community Strategy 2009-2026
Cllr Francine Haeberling David Trethewey
Sarah Flitter
01225
477807
WC  PC  TC  OS  Cab  Int  SU  YC  CIG  SP  PSB  CX  Mon  151 Bath & North East Somerset Community Strategy 2004 AP
E1983   Revenue & Capital Outturn 2008/09
This report presents the provisional revenue and capital outturn for 2008/09, with some recommended technical adjustments. The report refers to known potential pressures for the current year, as a preface to a request to carry forward specific budget items to 2009/10. The report also includes the Treasury Management outturn as required by the CIPFA code of practice.
Cllr Malcolm Hanney Paul Fox
Jamie Whittard
01225
477213
Cab  CX  Mon  151   AP
E1995 KEY Adoption of the Council's Adult Safeguarding Scheme
This Scheme will be part of the overall Safeguarding Scheme for the Health & Wellbeing Partrnership.  It  will set out the Safeguarding policy background, roles, responsibilities and assurance arrangements for the commissioning and provision of adult services
Cllr Vic Pritchard Jane Ashman
01225
477910
OS  SU  SP  CX  Mon  151 Draft Scheme previously published with Agenda for Partnership Board for Health & Wellbeing 15-Apr-09 JA
BATH RECREATION GROUND TRUST - 15 JULY 2009  1pm
E1975 BRT Lettings Update & Review of Strategy and Charges
Update on lettings at the Recreation Ground since last reported; and review of current letting startegy and charges
Bath Recreation Ground Trust Margaret Masling
01225
477005
Matthew Smith
01225
396888
    CX
E1976 BRT Update on General Management Issues
Car Parking update; Property Asset/Maintenance issues and other day to day management issues
Bath Recreation Ground Trust Margaret Masling
01225
477005
    CX
E1977 BRT Update on Progress with Charity Commission
Progress on response to Charity Commission
Bath Recreation Ground Trust Keith Bray
07811
800612
    CX
WEST of ENGLAND JOINT TRANSPORT COMMITTEE - 16 JULY 2009
E1965 WoE Joint Local Transport Plan 2 (JLTP2)
To approve the outline content and timetable for JLTP2
WoE Joint Transport Committee Terry Wagstaff
CX, WoE Partnership
0117
922 2639
    GC
E1966 WoE Local Transport Act 2008
To consider the provisions and opportunities for the sub-region in the Local Transport Act 2008
WoE Joint Transport Committee Terry Wagstaff
CX, WoE Partnership
0117
922 2639
    GC
INDIVIDUAL CABINET MEMBER DECISIONS ANTICIPATED IN JULY 2009
E1985   Adoption of a Policy for the making of Public Path Orders
The policy seeks to explain how the council will exercise its discretion in the making of public path orders to create, divert or extinguish public rights of way. The policy has been developed in partnership with Bristol City and South Gloucestershire Councils and is an identified action in the adopted Joint Rights of Way Improvement Plan
Cllr Charles Gerrish Will Steel
01225
477622
WC  PC  TC  Int  SU  SP  Mon  151 Joint Rights of Way Improvement Plan GC
INDIVIDUAL CABINET MEMBER DECISIONS ANTICIPATED IN AUGUST 2009
E1912 RVW Overview & Scrutiny Transformation Project - Council Connect
The Cabinet Members will be asked to respond to the Panels recommendations within six weeks
Cllrs Malcolm Hanney, Charles Gerrish Donna Vercoe
Cllr David Dixon
01225 462590
07900 974975
OS  St  Int  SU  LR  SP   AP
E1991   Treasury Management Monitoring Report to 30-Jun-09
This report gives details of performance against the Council's Treasury Management Strategy and Annual Investment Plan 2009/10 for the first 3 months of 2009/10
Cllr Malcolm Hanney Jamie Whittard
01225
477213
Mon Treasury Management Strategy & Annual Investment Plan 2009/10 AP
INDIVIDUAL CABINET MEMBER DECISIONS ANTICIPATED IN SEPTEMBER 2009
E1547 TRO Edward Street / Vane Street - Traffic Management Improvement
Edward St./Vane St. to be made one-way (west to east), existing residents parking bays in Vane Street rotated by 45 and 90 degrees to the kerbline
Cllr Charles Gerrish Simon Thomas
01225
394249
WC  St  Int  LR  CIG  PSB   GC
WEST of ENGLAND JOINT TRANSPORT COMMITTEE - 01 OCT 2009
E1967 WoE South Bristol Link –Programme Entry Bid
To approve the programme entry bid for the South Bristol Link project
WoE Joint Transport Committee Terry Wagstaff
CX, WoE Partnership
0117
922 2639
    GC
E1968 WoE Highways Agency
To review progress and future plans with the Highways Agency
WoE Joint Transport Committee Terry Wagstaff
CX, WoE Partnership
0117
922 2639
    GC
E1969 WoE First
To review progress and future plans with the bus company First
WoE Joint Transport Committee Terry Wagstaff
CX, WoE Partnership
0117
922 2639
    GC

 

Return to Top

Return to List of Forward Plans

The information shown on this page is maintained by Democratic Services Col_Spring@bathnes.gov.uk Tel 01225 39 4942